Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work includes approx 9,055.9 SY removal of asphalt pavement; 4,495 SY general excavation; 80 LF SY 24" RCP cross drain pipe; 56 LF 42" RCP storm drain pipe; 174 LF 4" width 4' length temporary pavement markings.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Largo is soliciting bids for the Rosery Rd NE Mobility Improvements project involving roadway construction, including asphaltic and non-asphaltic materials, general construction/maintenance and roadside services. Bid documents include plans, specifications, measurement and payment details and are available for download from the official posting. The solicitation is an Invitation for Bid with a bid opening/close deadline of January 7, 2026 and is not a grant program.
Posted Date
Dec 8, 2025
Due Date
Jan 7, 2026
Release: Dec 8, 2025
Close: Jan 7, 2026
The City of Largo is soliciting bids for the Rosery Rd NE Mobility Improvements project involving roadway construction, including asphaltic and non-asphaltic materials, general construction/maintenance and roadside services. Bid documents include plans, specifications, measurement and payment details and are available for download from the official posting. The solicitation is an Invitation for Bid with a bid opening/close deadline of January 7, 2026 and is not a grant program.
Premium
Access the largest public sector contact database
The Project includes the following Work: Holt Road – Remove temporary bridge, demolish old bridge, cast-in-place concrete footersstemwalls, installation of new BridgeCor culvert with aluminum headwalls, rock armoring, roadway construction and associated work. Laird Pond Road – Remove existing culvert, cast-in-place concrete footers-stemwalls, installation of new aluminum arch culvert, rock armoring, roadway construction and associated work. Pigeon Pond Road – Remove existing culvert, precast concrete box culvert installation, rock armoring, roadway construction and associated work. Maple Hill Road – Remove existing culvert, installation of pipe arch culvert with cast-in-place headwalls, rock armoring, roadway construction and associated wor
Posted Date
Nov 12, 2025
Due Date
Dec 19, 2025
Release: Nov 12, 2025
Close: Dec 19, 2025
The Project includes the following Work: Holt Road – Remove temporary bridge, demolish old bridge, cast-in-place concrete footersstemwalls, installation of new BridgeCor culvert with aluminum headwalls, rock armoring, roadway construction and associated work. Laird Pond Road – Remove existing culvert, cast-in-place concrete footers-stemwalls, installation of new aluminum arch culvert, rock armoring, roadway construction and associated work. Pigeon Pond Road – Remove existing culvert, precast concrete box culvert installation, rock armoring, roadway construction and associated work. Maple Hill Road – Remove existing culvert, installation of pipe arch culvert with cast-in-place headwalls, rock armoring, roadway construction and associated wor
AvailableWork includes removal and replacement of asphalt, striping, signage and addition of concrete sidewalks
Posted Date
Nov 6, 2025
Due Date
Dec 19, 2025
Release: Nov 6, 2025
Close: Dec 19, 2025
Work includes removal and replacement of asphalt, striping, signage and addition of concrete sidewalks
AvailableImprovements include constructing a raised pedestrian crosswalk for improved visibility and safety.
Posted Date
Dec 3, 2025
Due Date
Dec 30, 2025
Release: Dec 3, 2025
Close: Dec 30, 2025
Improvements include constructing a raised pedestrian crosswalk for improved visibility and safety.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis