Stripping and Re-Waxing Community Center Floor RFP
Stripping and re-waxing the community center floor, to include the main room (5846 ft), kitchen (680 ft), bathroom and hall (537 ft).
Description: Strip, clean, and refinish designated hard-surface floors at 2 kittridge lane.
PoliceDepartment · NH, US
Original attachments and procurement documents tied to this bid.
Procurement and program contacts connected to Littleton Police Department.
Adjacent opportunities open for bidding right now.
CityNE
Aug 12, 2026
Closes
Aug 26, 2026
Stripping and re-waxing the community center floor, to include the main room (5846 ft), kitchen (680 ft), bathroom and hall (537 ft).
Special DistrictNY
Aug 13, 2026
Closes
Sep 7, 2026
Project includes Phase 1: Mobilization & Traffic Control; Phase 2: Milling & Prep Work; Phase 3: Sub-Base Inspection & Repair; Phase 4: Asphalt Application (Heavy-Duty Specification); Phase 5: Striping & Markings.
CityIL
Aug 4, 2026
Closes
Aug 21, 2026
Floor stabilization. selected contractor shall furnish all labor, materials, equipment, and supervision necessary to perform the following work at the Property: 1. Mobilize to the site and protect all existing finishes, furnishings, adjacent structures, and landscaping not part of the work area. 2. Install low mobility (low-slump) compaction grout beneath the affected family room floor slab in accordance with SEECO's recommendations, to densify the saturated and/or poorly compacted clay fill, decrease and correct ongoing settlement, and increase soil bearing capacity beneath the slab. See attached file.
Truckee-Tahoe Airport District
Special DistrictCA
Aug 12, 2026
Closes
Sep 2, 2026
Provide resurface 20,000 sq. Ft. Of concrete hangar floors with epoxy and polyurethane coating. The goal of the Concrete Hangar Floor Resurfacing 2026 Project (Project) is to seal and epoxy coat hangar flooring. Project is meant to maximize its useful life and improve customer enjoyment and safety.