Nevada State Public Works Board
State AgencyNV
Posted
Aug 20, 2026
Nov 18, 2026
Fire Suppression System-Army Aviation Support Facility RFP
Work includes installation of an Ignitable Liquid Drainage Floor Assembly.
Description: Work will be done under one prime contract that includes: General and Civil construction.The following summary is a general guide to the scope of work. It should not be constructed as a detailed list of work included in the contract. Work on this project includes removal of existing bituminous pavements, preparation of subgrade, construction of a new bituminous pavement, and painted pavement markings on the new pavement.
StateAgency · MN, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from Minnesota Department of Military Affairs.
These related opportunities are still open for bidding.
Nevada State Public Works Board
State AgencyNV
Posted
Aug 20, 2026
Nov 18, 2026
Work includes installation of an Ignitable Liquid Drainage Floor Assembly.
CityMI
Posted
Oct 14, 2026
Nov 19, 2026
Lighting and pavement improvements. This project includes lighting replacement, surface pavement treatments, and pavement markings. Work includes replacing the fifty-three (53) lights, main runway crack seal at approx. 17,750 pounds, taxiway and parking area crack seal at approx. 6,350 pounds, mastic repairs at approx. 6-12" wide for 6,400 LF, sealcoating at approx. 36,000 SY, and pavement markings.
CityCA
Posted
Oct 28, 2026
Nov 18, 2026
Construction of the pedestrian intersection improvements and pavement rehabilitation.
CityCA
Posted
Oct 29, 2026
Dec 15, 2026
The Work required by this Contract includes, but is not limited to, the following: realignment, relocation, shifting, resurfacing, and rehabilitation of existing railroad tracks and construction of new lead tracks within the Pier B rail yard and Pico Avenue corridor, including special trackwork (turnouts and a crossover); modification of the railroad signal system at CP Gaspur; demolition and removal of existing tracks, pavement, utilities, and structures, including removal of abandoned third party utilities; earthwork, grading, subgrade preparation, and soil disposal; storm drain and underdrain improvements; utility protection, including a casing extension for water line protection and protection of the LACSD trunk sewer; relocation of street lighting; fencing; and traffic control, with the Work phased around active railroad operations.