State AgencyTX
Posted
-
Oct 22, 2026
Caldwell Municipal Airport - Airfield Pavement & Electrical Improvements
Work consists of airfield pavement & electrical improvements.
Description: Lighting and pavement improvements. This project includes lighting replacement, surface pavement treatments, and pavement markings. Work includes replacing the fifty-three (53) lights, main runway crack seal at approx. 17,750 pounds, taxiway and parking area crack seal at approx. 6,350 pounds, mastic repairs at approx. 6-12" wide for 6,400 LF, sealcoating at approx. 36,000 SY, and pavement markings.
City · MI, US
Solicitation files and supporting documents for this bid.
Adjacent opportunities open for bidding right now.
State AgencyTX
Posted
-
Oct 22, 2026
Work consists of airfield pavement & electrical improvements.
State AgencyTX
Posted
-
Oct 22, 2026
Work consists of airfield pavement & electrical improvements.
Alabama Department of Transportation
Special DistrictAL
Posted
Oct 9, 2026
Nov 6, 2026
Work includes 18 SY removing concrete flumes, 253 LF removing curb and gutter, 2 EA removing inlets, 900 CY unclassified excavation, 197 CY borrow excavation (loose truckbed measurement)(a4 or better), 87 CY structure excavation, 13 CY foundation backfill, commercial, 135 Ton crushed aggregate, section 825, type b, for miscellaneous use, 13,895 SY planing existing pavement (approx 8.10" thru 9.0" thick), 1,847 SY planning existing pavement (approx 10.1" thru 11.0" thick), superpave bituminous concrete wearing surface layer, leveling, 3/4" maximum aggregate size mix, esal range c/d 50 Ton, 15,741 SY plain cement concrete pavement,12" thick. See attached file.
CityWA
Posted
Oct 8, 2026
Nov 5, 2026
Work includes approx 725 CY of Roadway excavation; 1,115 TN of crushed surfacing top course; 1,600 LF of 1" milling crack sealing bit Pvmt wider; 940 SY of pavement repair excavation; 1,710 TN of HMA CI 3/8" PG 64H-28; 1,267 LF of cement conc. traffic curb and gutter.
Decision makers connected to this RFP from City of Evart.