University Of British Columbia
Higher EducationBC
Posted
Sep 18, 2026
Oct 8, 2026
Pre-qualification for Electric Boiler Supply for Academic District Energy System (ADES) Electric Boiler & Thermal Energy Storage Project (EBTES)
The University of British Columbia is seeking qualified and experienced suppliers to provide an electric boiler for its Academic District Energy System (ADES) Electric Boiler & Thermal Energy Storage Project (EBTES) at the UBC Vancouver campus. The related capital project will add 10 megawatts of electric boiler capacity and a 100 megawatt-hour thermal energy storage tank at the existing Campus Energy Centre, together with supporting electrical infrastructure and a small adjacent building. The posting describes a formal pre-qualification solicitation for electric boiler supply and does not identify the opportunity as a grant program.
