Posted
Oct 30, 2026
Dec 1, 2026
HVAC Electrification – Recreation Center RFP
Work includes HVAC Electrification.
Description: Provide a comprehensive fleet electrification plan for the county motor pool program.
County · OR, US
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from Jackson County.
These related opportunities are still open for bidding.
Posted
Oct 30, 2026
Dec 1, 2026
Work includes HVAC Electrification.
NYC School Construction Authority
State AgencyNY
Posted
Oct 26, 2026
Nov 19, 2026
Extent of Work: removal and demolition of selected items from selected areas of the building; items to be removed include: Existing RTUs and other select equipment and associated piping; existing concrete curb and roofing, drains and associated items; existing gas fired cooking equipment and associated piping; existing domestic hot water heater and associated piping; existing gas service and meters; existing paint storage room; Existing bulkhead door; sprinkler main and heads to be relocated from existing paint storage room; all associated electrical wiring and devices to facilitate removals and the new work; all fire alarm work and devices to facilitate the removals and new work.
Washington State Department of Transportation
State AgencyWA
Posted
Mar 20, 2026
Nov 24, 2026
DESIGN-BUILD: Project will enable charging of washington state ferries hybrid electric vessels at colman dock slips #1 and #3. The design build contractor will work closely and collaboratively with the systems integrator, washington state ferries, vessel charging system (vcs) supplier, and seattle city light (scl) to construct a complete system through the following project components. Installation of two submarine cables via directionally drilled conduits and seafloor surface lay between pier 48 and Colman Dock.
Washington State Department of Transportation
State AgencyWA
Posted
Mar 20, 2026
Nov 24, 2026
DESIGN-BUILD: Project will enable charging of washington state ferries hybrid electric vessels at colman dock slips #1 and #3. The design build contractor will work closely and collaboratively with the systems integrator, washington state ferries, vessel charging system (vcs) supplier, and seattle city light (scl) to construct a complete system through the following project components. Installation of two submarine cables via directionally drilled conduits and seafloor surface lay between pier 48 and Colman Dock.