Coyote Point Marina, part of San Mateo County Parks, requires a temporary administrative workspace to accommodate four to six marina staff while the existing marina office is removed and replaced. This temporary workspace is an interim solution to accommodate marina daily operations and provide marina staff with an on-site location to conduct their daily duties and offer customer service to marina tenants and park visitors. This temporary office will be located adjacent to the current marina office at 1900 Coyote Point Drive, San Mateo, CA 94401.
Mobile Office Requirements:
Mobile Office Trailer minimum size of 10’ x 40’ delivered to Coyote Point Marina, 1900 Coyote Point Drive, San Mateo, CA 94401
OSHA compliant steps with handrail and ADA compliant access ramp if unit entrance doors are not at ground level
Ability to accommodate 120V electrical hook-up from adjacent structure
HVAC with ducted supply (return air through wall) with thermostat control and dedicated power outlet(s)
Minimum of twelve duplex outlets for general use
8’ suspended ceiling
Internal lights and wall mounted light switches
Interior wall covering
Vinyl or similar floor covering (no carpeting)
Internal partitions for two offices a minimum size of 10’ x 8’
Painted steel exterior doors with deadbolt
Horizontal sliding windows with blinds
Optional: Office furniture for four workstations with computer and printer (desks and file cabinets/storage)
Vendor Requirements:
Vendor will provide schematic drawings, layouts, and images of proposed unit
Vendor will deliver to Coyote Point Marina, 1900 Coyote Point Drive, San Mateo, CA 94001 within one-month of purchase, rent, or lease agreement approval
Vendor will level, stabilize, and anchor on-site
Vendor will provide a tutorial of unit features and preventative maintenance
The existing marina office is no longer useable or suitable for staff and as a location to provide customer service to marina tenants and park visitors. Marina staff have been displaced and do not have an on-site workplace location. Delivery of project within thirty days of agreement approval is critical.