Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes hardening improvements; remove and dispose of existing shingle roof and replace with a standing seam metal roof. Basis of design is 24 ga. , 16" berridge zee lock double lock l - panel with two grooves. Florida product approval fl# 19999. 4; remove and dispose of existing wood roof deck and replace with a steel roof deck, install updated hurricane truss strapping anchors, deck anchorage and truss reinforcement. Provide new equipment curbs as required, typical. See structural and mechanical; install hurricane strap-downs for rooftop equipment and anchoring for roof mounted hvac fans and intakes. Provide new curbs as required, typical. See mechanical.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The project is for the hardening of station no.1 to increase resistance to wind damage and includes the following: Replace all windows, replace all exterior doors including swing and overhead doors, renovate (4) restrooms, select masonry veneer repairs, select eifs repairs, and replacement of sloped standing seam metal roof, replace metal panel at gable ends of roof-low slope membrane roof is to remain, re-work kitchen exhaust fan, replace all coping. New owner furnished contractor installed natural gas generator Included in project as well.
Posted Date
Dec 28, 2025
Due Date
Jan 29, 2026
Release: Dec 28, 2025
Close: Jan 29, 2026
The project is for the hardening of station no.1 to increase resistance to wind damage and includes the following: Replace all windows, replace all exterior doors including swing and overhead doors, renovate (4) restrooms, select masonry veneer repairs, select eifs repairs, and replacement of sloped standing seam metal roof, replace metal panel at gable ends of roof-low slope membrane roof is to remain, re-work kitchen exhaust fan, replace all coping. New owner furnished contractor installed natural gas generator Included in project as well.
AvailableMiami-Dade Water and Sewer Department is soliciting contractors for storm hardening upgrades at Pump Station No.1, including flood-proofing building openings, hardening exterior equipment, ventilation improvements, and related civil, mechanical, electrical and instrumentation work. The project requires contractors with wastewater facility and sodium hypochlorite storage experience and appropriate general/building and specialty licenses; a mandatory pre-bid meeting/site visit is scheduled. Construction is expected to begin in April 2026 and last approximately 400 calendar days.
Posted Date
Jan 15, 2026
Due Date
Mar 5, 2026
Release: Jan 15, 2026
Close: Mar 5, 2026
Miami-Dade Water and Sewer Department is soliciting contractors for storm hardening upgrades at Pump Station No.1, including flood-proofing building openings, hardening exterior equipment, ventilation improvements, and related civil, mechanical, electrical and instrumentation work. The project requires contractors with wastewater facility and sodium hypochlorite storage experience and appropriate general/building and specialty licenses; a mandatory pre-bid meeting/site visit is scheduled. Construction is expected to begin in April 2026 and last approximately 400 calendar days.
Work includes fire station #2.
Posted Date
Jan 9, 2026
Due Date
Feb 5, 2026
Release: Jan 9, 2026
Close: Feb 5, 2026
Work includes fire station #2.
AvailableThe City of Corona is soliciting prequalification submissions (RFQual RFQ 26-027CA) for the Fire Station No. 2 - Phase 1 Project, which includes construction of a 7,800 sq ft apparatus/storage building, a 900 sq ft gym, site improvements, underground utilities, an emergency generator, and related work. Only Class B General Building Contractors may apply and must complete the prequalification questionnaire and submit required documentation electronically through the PlanetBids Documents & Attachments tab. The prequalification package is due Feb 5, 2026 at 3:00 PM PST and the construction period is anticipated to begin July 2026 with completion by June 2027.
Posted Date
Jan 6, 2026
Due Date
Feb 5, 2026
Release: Jan 6, 2026
Close: Feb 5, 2026
The City of Corona is soliciting prequalification submissions (RFQual RFQ 26-027CA) for the Fire Station No. 2 - Phase 1 Project, which includes construction of a 7,800 sq ft apparatus/storage building, a 900 sq ft gym, site improvements, underground utilities, an emergency generator, and related work. Only Class B General Building Contractors may apply and must complete the prequalification questionnaire and submit required documentation electronically through the PlanetBids Documents & Attachments tab. The prequalification package is due Feb 5, 2026 at 3:00 PM PST and the construction period is anticipated to begin July 2026 with completion by June 2027.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis