Summary
The removal of five (5) single leaf and one (1) double leaf man doors to be replaced with five (5) single leaf and one (1) double leaf Pedestrian Flood Doors. The doors will be installed in the existing openings. Provide & install eleven (11) 1-1/2" 'Trusscore' panels at the interior of the building between the existing tube columns behind the existing 'Kalwall' panels. Provide and install 4 (four) masonry 'sweep walls' with new foundations, two at the main front entry and two at the main rear entry to accommodate each of the 'Passive Horizontal Flood Barriers'. Provide and install 2 (two) Passive Horizontal Flood Barriers' (front & rear) including concrete flatwork removal, new foundation system, installation of all associated parts & accessories, connection to the existing stormwater drainage system and restoration of all associated concrete flat work. Removal of approximately twenty (20) glazing panels at the 'Rehearsal Room' to be replaced with equivalent sized 'Fenex' flood resistant window units. Provide & install two (2) coats of 'Basecrete' cementitious waterproofing to the entire perimeter of the building to a height of 36" above grade, including behind the corrugated steel siding as well as below grade as noted in the construction documents. Provide an Add Alternate to clean the existing EIFS exterior wall system and refinish with a color that matches the 'Basecrete' color pallet as selected by the Client.