Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Scope work consists to replace the fire sprinkler main and dry pipe valves in the clubhouse.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Seeking proposals from qualified firms who can provide fire sprinkler inspection and testing.
Posted Date
Oct 15, 2025
Due Date
Jan 26, 2026
Release: Oct 15, 2025
Close: Jan 26, 2026
Seeking proposals from qualified firms who can provide fire sprinkler inspection and testing.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This project includes the design and provision to replace portions of the existing fire sprinkler system in Windom Elementary School. The project includes the demolition of portions of the existing system. The building shall be fully sprinklered at the completion of the project. Windom Elementary School is currently protected with an existing dry sprinkler system that provides protection for both the Level 2 conditioned spaces as well as the combustible attic spaces above. The purpose of this project is to separate the existing dry system into two separate systems, a wet sprinkler system to protect the Level 2 conditioned spaces and a dry sprinkler system for the combustible attic spaces. This project includes the modification of the existing sprinkler riser manifold in 04A Sprinkler Room on the ground level, the provision of a new Nitrogen Generator, and provision of a new FDC check valve. All new electrical and fire alarm connections are to be provided and tied into the existing fire alarm and building systems.
Posted Date
Jan 8, 2026
Due Date
Feb 10, 2026
Release: Jan 8, 2026
Close: Feb 10, 2026
This project includes the design and provision to replace portions of the existing fire sprinkler system in Windom Elementary School. The project includes the demolition of portions of the existing system. The building shall be fully sprinklered at the completion of the project. Windom Elementary School is currently protected with an existing dry sprinkler system that provides protection for both the Level 2 conditioned spaces as well as the combustible attic spaces above. The purpose of this project is to separate the existing dry system into two separate systems, a wet sprinkler system to protect the Level 2 conditioned spaces and a dry sprinkler system for the combustible attic spaces. This project includes the modification of the existing sprinkler riser manifold in 04A Sprinkler Room on the ground level, the provision of a new Nitrogen Generator, and provision of a new FDC check valve. All new electrical and fire alarm connections are to be provided and tied into the existing fire alarm and building systems.
AvailableProcurement of services for the 2026 Partial Roof Replacement at Edinburgh Clubhouse.
Posted Date
Jan 1, 2026
Due Date
Jan 22, 2026
Release: Jan 1, 2026
Close: Jan 22, 2026
Procurement of services for the 2026 Partial Roof Replacement at Edinburgh Clubhouse.
AvailableThe Citadel requests quotes for NFPA 25 (2020) five-year internal piping and valve inspections for fire protection risers and standpipes, including internal pipe and obstruction inspections, flow and pressure testing, valve and FDC inspections, and corrective-action recommendations; covers ~30 risers (28 wet, 2 dry/pre-action) across campus and one off-campus site. Deliverables: comprehensive inspection reports, photos, updated tags, and certification of NFPA 25 compliance. Awards may be made by item or lot.
Posted Date
Dec 3, 2025
Due Date
Dec 17, 2026
Release: Dec 3, 2025
Close: Dec 17, 2026
The Citadel requests quotes for NFPA 25 (2020) five-year internal piping and valve inspections for fire protection risers and standpipes, including internal pipe and obstruction inspections, flow and pressure testing, valve and FDC inspections, and corrective-action recommendations; covers ~30 risers (28 wet, 2 dry/pre-action) across campus and one off-campus site. Deliverables: comprehensive inspection reports, photos, updated tags, and certification of NFPA 25 compliance. Awards may be made by item or lot.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →