CityOH
Posted
Oct 28, 2026
Nov 18, 2026
FILE NO. 119-26 Street Lighting Materials RFP
Procurement of street lighting materials for the Division of Cleveland Public Power.
Description: Procurement of LED street security lighting luminaires for the Division of Cleveland Public Power.
City · OH, US
Adjacent opportunities open for bidding right now.
CityOH
Posted
Oct 28, 2026
Nov 18, 2026
Procurement of street lighting materials for the Division of Cleveland Public Power.
CityLA
Posted
Oct 22, 2026
Nov 17, 2026
Work includes 7,586 LF 1 1/2" trenching & backfilling; 914 LF of 1 1/2" jack & boring conduit; temporary signs & barricades; 251 LF 1 1/2" rigid galvanized steel; 8,500 LF of 1 1/2" PVC duct; 21,258 LF of 600V cable; 3 EA of 30A/4P lighting; 2 EA lead Area light Type D.
Special DistrictMN
Posted
Oct 29, 2026
Nov 24, 2026
The Metropolitan Council is requesting sealed bids for Green Line OMF-LED Lighting. The work of this project includes replacing lighting and controls at the Green Line OMF building. A pre-bid meeting will be held on November 10, 2026, at 11:00 am via Microsoft Teams. Please contact the IFB Administrator: Sally.Amoe@metc.state.mn.us with any questions. For more information, click on contract number “26P031” on the Metropolitan Council’s Contracting Opportunities Page: https://metrocouncil.org/contracting. This will open an advertisement document with a “click here” link which will bring you to the Bid documents on QuestCDN. Documents are free to review. DOCUMENTS: The Metropolitan Council is only accepting electronic bid packages until 2:00 pm CDT (UTC-5) on November 4, 2026. All bids MUST be submitted through Questcdn.com. Complete digital project documents are available online through QuestDN.com. Contact QuestCDN at 952-233-1632 or Support@questcdn.com for assistance in downloading and working with the digital documents. All technical issues should be directed to QuestCDN.
Posted
Oct 12, 2026
Nov 10, 2026
Project consists of replacing existing lighting fixtures and circuits with new fixtures in various locations throughout the network center.
From the first pre-RFP signals to the published RFP and its files.
Strategic plan
The Municipal Action Plan proposed completing streetlight replacement with LED lights and continuing maintenance and savings tracking.
MAYORAL PRIORITY ACTION 17 Cleveland Division of Water (CWD) System Pumping and Treatment Optimization. Create and finalize an energy management plan with implementation pathways to reduce energy consumption and costs for CWD. Division of Water, Department of Public Utilities, Office of Sustainability ACTION 18 Streetlight Upgrades, tracking and…
City of Cleveland Municipal Action Plan 2025-2050
Decision makers connected to this RFP from City of Cleveland.
Strategic plan · 2025
Board meeting
455 days before RFP
The Board of Control rejected all bids received for Group E of the LED street and security lighting luminaires procurement.
10825 rejecting all bids received May 14th, 2025 for group E of the LED street and security lighting luminers. And then number 10925 is both public utilities and public works requesting the rejection of all bids received on June 18, 2025 for rental of various heavy duty equipment. Recommend approval. >> Are there any questions? Hearing none. >> All in favor…
Board of Control Meeting Minutes
Board meeting · Jul 23, 2025
Board meeting
257 days before RFP
City project staff reported that the funded E66 Chester-to-Superior multimodal project was going into construction in summer 2026 and included pedestrian lighting.
Thanks, Rick. Um, so, uh, our E66 project, which has been called, uh, the Midtown Huff connector, Huff Midtown Connector, um, Dream 66 and other names, uh, was originally a TLCI planning project, uh, with the city and NOAKa and all of our stakeholders. And we are so thrilled that this project is going into construction. Um, so as a reminder of where it is,…
City Planning Commission Meeting
Board meeting · Feb 6, 2026
Board meeting
229 days before RFP
The proposed parking-revenue special fund projected about $600,000 for 2026 and $1.25–$1.5 million annually for safety and mobility investments, including enhanced lighting.
benefits fund. And so what we're looking to do, this is one of those goals as I mentioned, is to be able to create a special revenue fund where we can take a portion of the revenue from on street metered parking and be able to reinvest that right back into re into neighborhoods uh citywide. Uh the target of the investments is looking towards things that we…
City Planning Commission Planning Commission Meeting
Board meeting · Mar 6, 2026
RFP published
Proposals due (7 days left)