Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work entails approx 275 LF of 5-footwide sidewalk on the west side of street, including a public alley entrance. Bid alternate #1 work entails approx 290 LF of 5-foot-wide sidewalk on the west side of street, including two driveway entrances, plus a handicapped accessible ramp on the east side of street. Align new sidewalk and alley entrance with existing ramp and existing sidewalk. Align new sidewalk with existing ramp and existing sidewalk. Align new sidewalk and entrances with existing ramps. Excavation shall be performed as necessary so that finished grade is consistent with surrounding area. Excess excavated material shall be properly disposed of; etc, see attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Construct sidewalk along 36th Street from Colonel Glenn Road to Boyle Park Road.
Posted Date
Jan 6, 2026
Due Date
Jan 27, 2026
Release: Jan 6, 2026
Close: Jan 27, 2026
Construct sidewalk along 36th Street from Colonel Glenn Road to Boyle Park Road.
Construct 5' wide sidewalk to the existing sidewalk.
Posted Date
Jan 13, 2026
Due Date
Feb 18, 2026
Release: Jan 13, 2026
Close: Feb 18, 2026
Construct 5' wide sidewalk to the existing sidewalk.
AvailableConstruction of a new pedestrian sidewalk along the south side of mechanic street. The sidewalk will extend an existing sidewalk and be constructed between 95 mechanic street and the slayton hill road intersection to improve pedestrian accessibility and safety along the project corridor. Project elements include the installation of granite curbing, bituminous concrete sidewalk, driveway apron reconstruction, stormwater infrastructure, a concrete block retaining wall, landscape restoration, and associated roadway patching.
Posted Date
Jan 7, 2026
Due Date
Jan 28, 2026
Release: Jan 7, 2026
Close: Jan 28, 2026
Construction of a new pedestrian sidewalk along the south side of mechanic street. The sidewalk will extend an existing sidewalk and be constructed between 95 mechanic street and the slayton hill road intersection to improve pedestrian accessibility and safety along the project corridor. Project elements include the installation of granite curbing, bituminous concrete sidewalk, driveway apron reconstruction, stormwater infrastructure, a concrete block retaining wall, landscape restoration, and associated roadway patching.
The City of Sprague is soliciting sealed bids for the 4th Street Sidewalk Project. The work includes approximately 1,020 linear feet of new cement concrete sidewalk along 4th Street, with curb ramps, traffic curb, crosswalk markings, and installation of RRFBs and an advanced warning beacon. Bid documents are available through the Century West Engineering online plan room, and bids are due on February 6, 2026 at 11:00 AM (Pacific).
Posted Date
Jan 15, 2026
Due Date
Feb 6, 2026
Release: Jan 15, 2026
Close: Feb 6, 2026
The City of Sprague is soliciting sealed bids for the 4th Street Sidewalk Project. The work includes approximately 1,020 linear feet of new cement concrete sidewalk along 4th Street, with curb ramps, traffic curb, crosswalk markings, and installation of RRFBs and an advanced warning beacon. Bid documents are available through the Century West Engineering online plan room, and bids are due on February 6, 2026 at 11:00 AM (Pacific).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis