Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Pasadena
Seeking to procure labor and materials for fiber optic installation services city wide to support our public parks wi-fi expansion.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Lake Worth Beach
Provide design, material, supplies, installation, integration, repair, and support services for the fiber optic network system.
Posted Date
Nov 23, 2025
Due Date
Jan 7, 2026
Release: Nov 23, 2025
City of Lake Worth Beach
Close: Jan 7, 2026
Provide design, material, supplies, installation, integration, repair, and support services for the fiber optic network system.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Fairfield
Work include 2,696' install one (1) 2" conduit; 4,120' install tracer wire in conduit; 11 EA install handhold; 6 EA install route marker posts; 6,964' fiber optic cable, as per plan (underground); 589' fiber optic cable, as per plan (overhead); 11 EA materials hh with lid 24"x36"x30"; 4 EA slack installation; 100' install new conduit (emt up to 2") - interior; 180' bridge attachment (2" ridgid conduit).
Posted Date
Nov 14, 2025
Due Date
Dec 1, 2025
Release: Nov 14, 2025
City of Fairfield
Close: Dec 1, 2025
Work include 2,696' install one (1) 2" conduit; 4,120' install tracer wire in conduit; 11 EA install handhold; 6 EA install route marker posts; 6,964' fiber optic cable, as per plan (underground); 589' fiber optic cable, as per plan (overhead); 11 EA materials hh with lid 24"x36"x30"; 4 EA slack installation; 100' install new conduit (emt up to 2") - interior; 180' bridge attachment (2" ridgid conduit).
AvailableLos Alamos County
Project will connect four (4) water production wells and 4 water booster stations through a fiber optic loop to the supervisory controls and data acquisition (SCADA) control center. Work include installation of approx. four and a half (4.5) miles of aerial fiber optic lines, including the installation, splicing, testing, and landing of these cables inside of the well houses and booster stations. Three (3) underground fiber optic boxes will also be required, along with associated excavation and approximately 100' of new 4" SCH-40 PVC underground conduit will be installed. Miscellaneous work includes the installation of 8' - 35' wooden poles and general site cleanup.
Posted Date
Oct 5, 2025
Due Date
Dec 17, 2025
Release: Oct 5, 2025
Los Alamos County
Close: Dec 17, 2025
Project will connect four (4) water production wells and 4 water booster stations through a fiber optic loop to the supervisory controls and data acquisition (SCADA) control center. Work include installation of approx. four and a half (4.5) miles of aerial fiber optic lines, including the installation, splicing, testing, and landing of these cables inside of the well houses and booster stations. Three (3) underground fiber optic boxes will also be required, along with associated excavation and approximately 100' of new 4" SCH-40 PVC underground conduit will be installed. Miscellaneous work includes the installation of 8' - 35' wooden poles and general site cleanup.
Silicon Valley Power
The work to be performed on an on-call and as-needed based to the City. Work shall consist of both substructure and aerial fiber optic infrastructure and fiber optic cable throughout the City.
Posted Date
Nov 12, 2025
Due Date
Dec 11, 2025
Release: Nov 12, 2025
Silicon Valley Power
Close: Dec 11, 2025
The work to be performed on an on-call and as-needed based to the City. Work shall consist of both substructure and aerial fiber optic infrastructure and fiber optic cable throughout the City.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →