Fencing for Playland On West and South Side in Gage Park (Request for Proposal)
Description: Fencing for playland: provide all labor, materials, construction equipment, coordination, and supervision necessary for the additional fencing, stone columns, and concrete services.
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
From the first pre-RFP signals to the published RFP and its files.
1 file available
Board meeting
483 days before RFP
The Shawnee County Board of County Commissioners approved Parks and Recreation's amendment to the Playland site-preparation RFP to add safety surfacing, utilities, drainage, concrete work, and project management.
See sourceHide source
Next item, please. Four. Consider approval to amend the previously approved request for proposal for construction services to prepare the playland area for installation of playground equipment and safety servicing to include additional related construction elements. Funding from the gauge park Improvement Authority funds. Tim Laurren Parks and Recreation…
Shawnee County Board of County Commissioners Commission Meeting
Parks and Recreation received approval from the Shawnee County Board of County Commissioners to issue separate RFPs for Playland and Sky Trail site preparation, including excavation, drainage, footings, rebar, utility relocations, and concrete work.
See sourceHide source
>> F. Parks and Recreation. One, consider approval to issue requests for proposals for materials, construction, and other services related to site preparations for the the development of Gauge Park, Playland, and the Sky Trail. >> Good morning, commissioners. Tim Lorent, Parks and Recreation Department. So, recently you approved uh scoring out for an RFP…
Board meeting
221 days before RFP
The commission approved the east-side Playland fencing contract, and Parks and Recreation proposed continuing similar fencing on the other side.
See sourceHide source
>> item two, consider approval to award the bid for RFP number 004-26 and execute contract C206066 with Henderson Fence Incorporated for the construction of fencing and columns at Gage Parks Playland. The $51,41320 project cost will be funded with Gagege Park sales tax funds. Tim Lorent Parks and Recreation Department. So, this fence will be uh if approved…
RFP published
049-26 PR Gage Park FencingPDF
Proposals due (11 days left)
Shawnee County Board of County Commissioners Commission Meeting
Provide architectural and engineering services, permitting, labor, materials, equipment, supervision, testing, inspections, and related services necessary to deliver a complete, operational project.
Construction of a new playground. Play area of 65’x85’ with concrete border, appropriate sub-surface, grading and drainage. Pour-in-place or tile surfacing with accessible connection to existing sidewalk. Landscape Architects shall provide separate alternate pricing for each surfacing option. Main play feature consisting of a rope-and-cable climbing playground for ages 6–12 of at least 475 square feet, or a functionally equivalent playground structure of equal or greater size and comparable quality and play value. Three-bay minimum swing set. Two benches on pad or with pads. One trash receptacle located near the sidewalk.
Construction of a new playground. Play area of 65’x85’ with concrete border, appropriate sub-surface, grading and drainage. Pour-in-place or tile surfacing with accessible connection to existing sidewalk. Landscape Architects shall provide separate alternate pricing for each surfacing option. Main play feature consisting of a rope-and-cable climbing playground for ages 6–12 of at least 475 square feet, or a functionally equivalent playground structure of equal or greater size and comparable quality and play value. Three-bay minimum swing set. Two benches on pad or with pads. One trash receptacle located near the sidewalk.