Aug 3, 2026
Closes
Aug 28, 2026
2026 Bar Screen Building Rehabilitation Project for the Westfall Campus (Request for Quote)
Work consists of rehabilitation of bar screen building. Work includes building roof to be replaced; replacement of (2) existing windows in-kind with similar size; removal of non-functional lift system, electrical wiring, and conduit with safety grating to be installed to patch, as required; remove existing fixed ladder, safety chain, and safety railings, that accesses pit, replace with in kind and same size; removal of existing ventilation fan, electrical wiring, conduit, and louvers, replace in kind with same size and cubic feet per minute; removal of (4) existing interior lighting fixtures, switches, conduit, and replace with kind similar size; removal of (1) existing overhead heater, switch, conduit and replace in kind with similar size.