Eastern Municipal Water District
Special DistrictCA
Posted
Aug 26, 2026
Sep 23, 2026
Matthews Transmission Pipeline
The project primarily consists of construction of three separate pressurized potable-water pipelines and their connections to existing pipelines: Matthews Pipeline — from the Antelope Road/Ethanac Road area toward the future Antelope and Watson II Booster Pump Station. Watson Pipeline — connecting the future booster station to the existing Watson Road Booster Pump Station. Romoland Feeder Extension — connecting the future booster station to the existing Romoland Feeder.