Closed

Fairland High School Clinic

Description: Renovation of existing computer lab space in high school into new outpatient clinic. Selective interior demolition includes concrete floor demolition for waste line trenching and select demolition of mechanical and electrical systems in existing space. Interior fit out including concrete floor patching, metal-framed partitions gypsum-board finishes on walls and select ceilings, acoustic tile ceiling system, finished floors (varies), finished casework with solid surface countertops. Plumbing systems include sprinkler system, domestic cold and hot water system, and wastewater system. Mechanical systems include modified heating and cooling systems, direct digital control systems, insulated ductwork for supply and return air, and fire dampers. Electrical systems include electrical circuit panels, power receptacles and interior lighting, fire alarm systems, telecommunications data wiring and receptacles.

Buyer
OVP Health Care

Other · OH, US

Released
Jul 30, 2026
Closes
Aug 27, 2026(Closed)

Files

Original attachments and procurement documents tied to this bid.

No files attached to this RFP.

Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.

Request File Retrieval
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts