Alabama Department of Transportation
Special DistrictAL
Posted
Oct 4, 2026
Oct 29, 2026
New Approximately 2,400 SF Pre-engineered Metal Warehouse Building
Work includes site preparation and grading, concrete foundations and slab-on-grade, structural steel framing, pre-engineered metal building system, insulated metal wall and roof panels, overhead coiling doors, storefront entrance, office and ada-compliant restroom construction, architectural finishes, plumbing, mechanical, electrical, site utilities, exterior lighting, loading dock, retaining walls, concrete aprons, gravel access areas, drainage improvements, and all associated civil, structural, architectural, mechanical, electrical, and plumbing work.
