Higher EducationTX
Posted
Aug 12, 2026
Nov 10, 2026
WWTP Improvements Project- Phase 1
WWTP Improvements Project- Phase 1
Description: RAVA Construction will be accepting bids on the Coastal Water Authority “Trinity River Facilities”. This work will consist of three separate projects at three different locations. Lynchburg Pump Station (Baytown, TX) Main Canal Maintenance Station (Dayton, TX) Trinity River Pump System (Dayton, TX) Bidders may bid one, two or all three projects, however the bid must show the individual bid amount for each project if bidding more than one. The projects are planned to be constructed simultaneously starting January 2027 beginning with Lynchburg Pump Station. Main Canal Maintenance Station will start 45 days after Lynchburg Pump Station starts and Trinity River Pump System will start 45 days after Main Canal Maintenance Station starts. Sequencing is tentative. Bidders that are bidding two or three of these projects should look at their available resources to man more than one project at the same time. Inclusions and Exclusions should be included in your proposals. For technical difficulties please send proposals to bids@ravausa.com within bid time requirements.*bids are accepted through Civcast, however if you have difficulties please send your proposals to bids@ravausa.com within bidding time. Notes to Bidders: : The successful bidder’s responsibility to provide workers’ compensation insurance in accordance with Texas Labor Code Chapter 406. The successful bidder’s responsibility to pay prevailing wages pursuant to Texas Government Code Chapter 2258.
SpecialDistrict · TX, US
Decision makers connected to this RFP from Coastal Water Authority.
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
Higher EducationTX
Posted
Aug 12, 2026
Nov 10, 2026
WWTP Improvements Project- Phase 1
CityAR
Posted
-
Nov 10, 2026
This RFP is for Earthwork/Site Utilities/Site Concrete for the new Fire and Police Training Facility in Maumelle, Arkansas.
CityIN
Posted
Oct 20, 2026
Nov 23, 2026
Project includes improvements to the Town's existing wastewater treatment plant (WWTP) and collection system. The WWTP work includes but is not limited to headworks improvements: new in-channel articulating rake screen and manual bypass bar screen, ancillary structure modifications to reinforced concrete structure, grating, handrail and platform; aerated cell lagoon improvements: sludge removal, hauling and disposal, new floating aerators, new controls; replacement of clarifier tank plug valves, replacement of chlorine contact tank drain valve, new influent and effluent samplers and all other work required for the completion of WWTP improvements. The collection system work includes but is not limited to upgrading Lift Station #1, new submersible pumps, new monitoring and control package with VFDs and all lift station accessories for a complete operational pump system. The existing valve vault work includes replacement of check valves. Additional work includes bypass pumping, electrical utility coordination, perimeter fence installation and all other work required for the completion of the lift station improvements.
CityLA
Posted
-
Nov 10, 2026
The Town of Church Point seeks a qualified contractor for Phase 1 of its 2026-27 road improvement program, including about 3,870 tons of asphalt concrete wearing course, 230 square yards of pavement patching, and miscellaneous work. Three additive alternates add approximately 2,340 tons of asphalt and related work; bids require a 5% bid bond and a Louisiana public-works construction license, with award to the lowest responsible bidder meeting the requirements. Sealed bids are due November 10, 2026, at 11:00 a.m. CST, electronically through Central Bidding or in person at the Town Clerk’s office.