Dublin San Ramon Services District
Special DistrictCA
Posted
Oct 8, 2026
Nov 12, 2026
WWTP Electrical Improvements Phase 1 RFP
Work includes wwtp electrical improvements phase 1.
Description: WWTP Improvements Project- Phase 1
HigherEducation · TX, US
Adjacent opportunities open for bidding right now.
Dublin San Ramon Services District
Special DistrictCA
Posted
Oct 8, 2026
Nov 12, 2026
Work includes wwtp electrical improvements phase 1.
CityVA
Posted
-
Nov 10, 2026
Scope of work: contract 1 includes materials only, for return sludge pump impeller replacement. Contract 2 includes labor materials and equipment for installation of two sludge flow meters. Contract 3 includes labor materials and equipment for influent pump station new control programmable logic controller. Contract 4 includes labor materials and equipment to rebuild one existing centrifugal blower. Contract 5 includes labor materials and equipment for rehabilitation of two secondary clarifier concrete effluent troughs. Contract 6 includes labor materials and equipment for painting the ferrous steel of two secondary clarifiers.
CityIN
Posted
Oct 20, 2026
Nov 23, 2026
Project includes improvements to the Town's existing wastewater treatment plant (WWTP) and collection system. The WWTP work includes but is not limited to headworks improvements: new in-channel articulating rake screen and manual bypass bar screen, ancillary structure modifications to reinforced concrete structure, grating, handrail and platform; aerated cell lagoon improvements: sludge removal, hauling and disposal, new floating aerators, new controls; replacement of clarifier tank plug valves, replacement of chlorine contact tank drain valve, new influent and effluent samplers and all other work required for the completion of WWTP improvements. The collection system work includes but is not limited to upgrading Lift Station #1, new submersible pumps, new monitoring and control package with VFDs and all lift station accessories for a complete operational pump system. The existing valve vault work includes replacement of check valves. Additional work includes bypass pumping, electrical utility coordination, perimeter fence installation and all other work required for the completion of the lift station improvements.
CityLA
Posted
-
Nov 10, 2026
The Town of Church Point seeks a qualified contractor for Phase 1 of its 2026-27 road improvement program, including about 3,870 tons of asphalt concrete wearing course, 230 square yards of pavement patching, and miscellaneous work. Three additive alternates add approximately 2,340 tons of asphalt and related work; bids require a 5% bid bond and a Louisiana public-works construction license, with award to the lowest responsible bidder meeting the requirements. Sealed bids are due November 10, 2026, at 11:00 a.m. CST, electronically through Central Bidding or in person at the Town Clerk’s office.
Decision makers connected to this RFP from Texas A&M University.
Solicitation files and supporting documents for this bid.