CityFL
Posted
Oct 30, 2026
Jan 8, 2027
Floridian Aquifer Production Well FA-2 RFP
Work includes 1 LS prepare site for drilling including clearing, grubbing and fill; 1 LS furnish and install 36" steel casing, including grout to 20' bls; 170 LF furnish and install 36" steel casing, including grout to 20' bls; 190 LF furnish and install 30" steel casing, including grout to 190; 690 LF drill nominal 12" pilot hole from 190' to 880'; 680 lf furnish and install 20" steel casing from 170' to 850'; 1,690 sack cement grout 20" steel casing in place; 850 LF drill nominal 12" pilot hole from 850 feet to 1,700 LF using reverse air method.
