Construction of 95' single span reinforced concrete bridge, 90° skew.
Description: Work includes 1 LS of mobilization; 2,048 CY of borrow (plan quantity); 1,563 CY of granular borrow (plan quantity); 1,717 CY of embankment for bridge (plan quantity); 3,553 SY of separation geotextile; 2 EA of remove tree; 755 ft of remove guardrail; 60 FT of remove fence; 3 EA of remove mailbox; 4,672 sy of remove asphalt pavement; 662 CY of roadway excavation (plan quantity); 243 CY of loose riprap (d50 = 18"); 10 CY of loose riprap (d50 = 6"); 1,124 CY of untreated base course (plan quantity); 1,133 tn of hma - 1/2"; etc, see attached files.
StateAgency · UT, US
From the first pre-RFP signals to the published RFP and its files.
Board meeting
141 days before RFP
UDOT recorded a scope to replace the US-89 bridge over Clear Creek under PIN 21974 and provide the state match.
Our next item, the scope of pin 21974 is to replace the U. Own bridge carrying US89 over Clear Creek south of Joseph. This there was are significant roadway profile adjustments required to provide standard passage of clear creek under this bridge leading to unanticipated drive driveway tie-in construction as well as additional rightaway cost for temporary…
Utah Transportation Commission Meeting
Board meeting · May 15, 2026
RFP published
Proposals due (6 days left)
Decision makers connected to this RFP from Utah Department of Transportation.
Adjacent opportunities open for bidding right now.
CountyTN
Posted
Oct 20, 2026
Nov 10, 2026
Construction of 95' single span reinforced concrete bridge, 90° skew.
CountyTN
Posted
Oct 21, 2026
Nov 10, 2026
The solicitation seeks construction of a 95-foot, single-span reinforced-concrete bridge over Thompson Creek. The bridge has a 90-degree skew. The project is located on Janes Mill Road in Dresden, Tennessee.
Arkansas Department of Transportation
State AgencyAR
Posted
-
Nov 4, 2026
Work includes approx 452,452 CY unclassified excavation; 861 LF 24" temporary culvert; 1,714 LF 24" RCP class III cluverts; 11,042 LF guardrail; 4,693 SF retaining wall.
Indigenous GovernmentOK
Posted
Oct 6, 2026
Nov 10, 2026
Removal of existing Bridge and installation of a 13'x40'x20'/40'/20'Fast Cast Bridge with approaches.