CountyOH
Posted
Aug 17, 2026
Sep 29, 2026
ADA Accessibility Improvements - Phase I RFP
Provide ADA accessibility improvements.
Description: The purpose of this project is to construct grading and structures of a four - lane interstate facility, including improvements to the interstate. This project consists of clearing and grubbing, removal and disposal items, stone backfill, earthwork, select granular backfill, rock fill, trenching and shoulder preparation, aggregate base course, cement in cement stabilized crushed stone base course, processing cement stabilized crushed stone base course, ACHM base, binder, and surface courses, cold milling asphalt pavement, ACHM patching of existing roadway, approach slabs and gutters, maintenance of traffic, concrete ditch paving, minor drainage, erosion control, pavement marking, its items, illumination items, sign items, construct two continuous plate girder bridges.
StateAgency · AR, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
CountyOH
Posted
Aug 17, 2026
Sep 29, 2026
Provide ADA accessibility improvements.
CityNJ
Posted
Sep 2, 2026
Sep 23, 2026
Project includes, but is not limited to: concrete curb replacement, full width milling (2” depth) with an asphalt overlay, guide rail replacement, resetting or reconstruction of catch basins, striping, and sign replacements. The main items of construction and approximate quantities for the Base Bid include, but are not necessarily limited to 7,000 SY of milling (2” thick); 1,050 TN of 2" HMA 9.5 M64 Surface Course; resetting of twelve (12) Type-B inlets, reconstruction of five (5) Type-B catch basins with precast inlets and new cast iron frames, grates, replacement of 1,000 LF of 9x18 concrete curb.
CityAL
Posted
Sep 4, 2026
Sep 23, 2026
This Invitation to Bid is for furnishing all labor, materials, and equipment to widen North Donahue Drive from Shug Jordan Parkway to Sougahatchee Creek to provide a five-lane roadway, including multiuse paths, sidewalks, and traffic signal installations.
CityTX
Posted
Sep 4, 2026
Sep 21, 2026
The project includes scarifying, mixing, and reshaping the pavement surface and base material, removal of the top 6" of scarified asphalt and base, constructing a minimum 12" cement stabilized subgrade, and 1.5" Type D surface course over 4.5" Type B base course, along with all appurtenances.
Decision makers connected to this RFP from Arkansas Department of Transportation.