CityPA
Posted
Sep 2, 2026
Sep 4, 2026
Baled Straw & Excelsior Bales RFP
Baled straw & excelsior bales - need delivered before September 11, 2026.
Description: Interior remodel of the 3rd floor (5,500 SF) of the historic building, to reconfigure the space for municipal offices, meeting rooms, and public Council Chambers. Scope of work includes, but is not limited to: Demolition and selective interior removal. Cold-formed metal framing (CFMF), drywall, and demountable wall systems. Floor finish installation, including encapsulation of existing asbestos flooring. Millwork, custom Council Dais, Speaker Podium, and feature conference tables. Design-build fire suppression system meeting National Fire Protection Association (NFPA 13). Mechanical, electrical, plumbing (MEP), lighting, and code-required signage/exterior illuminated building sign allowance.
City · MN, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalDecision makers connected to this RFP from City of Excelsior.
Adjacent opportunities open for bidding right now.
CityPA
Posted
Sep 2, 2026
Sep 4, 2026
Baled straw & excelsior bales - need delivered before September 11, 2026.
Southeastern Pennsylvania Transportation Authority
Special DistrictPA
Posted
Sep 2, 2026
Sep 8, 2026
20 Ea tank new flyer 6459007 def. excelsior buses. (Shaw Development mfg #908-1164-03 das) or equal.
CityWA
Posted
Aug 14, 2026
Sep 11, 2026
Repairing and replacing equipment to modernize existing elevator to meet current electrical and elevator codes (ASME 17.1 2019) The City is asking for bids on full replacement of the City Hall Elevator controller, hydraulic unit, power unit along with all the electrical work needed to fully function and meet specifications and codes. Other work includes updating the hoistway, car operating panel, machine room electrical work, and pit and hallway panels with code compliant electrical updates.
CityKY
Posted
Aug 24, 2026
Sep 11, 2026
City Hall Repairs.