Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Requesting a quote to perform emergency pump station repairs and site improvements - contractor is responsible for temporary bypass of sewage during the rehabilitation of this pump station. Temporary bypass shall be from upstream manhole. To facilitate station bypass, contractor shall install plugs as necessary at the pump station and a temporary tap downstream to provide for continuous flow from upstream systems. Contractor is responsible for providing temporary power to the site and will transfer at the end of the project a complete working pump station with electrical service in place. Contractor shall ensure that proper erosion control measures (such as hay bales and/or silt fences) are used to prevent silt and material from disturbed areas from entering stormwater systems or canal tributaries; etc, see outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Goldthwaite seeks bids to rehabilitate the existing Cline Street Lift Station, including removal and replacement of pumps and piping. Bids will be opened on January 22, 2026 at 10:00 AM at Goldthwaite City Hall. Contract documents are distributed via the Jacob | Martin planroom, with digital downloads available to plan holders.
Posted Date
-
Due Date
Jan 22, 2026
Close: Jan 22, 2026
The City of Goldthwaite seeks bids to rehabilitate the existing Cline Street Lift Station, including removal and replacement of pumps and piping. Bids will be opened on January 22, 2026 at 10:00 AM at Goldthwaite City Hall. Contract documents are distributed via the Jacob | Martin planroom, with digital downloads available to plan holders.
Available2 EA of Pumps, Lift Station-60P; Parts Lift Station-60P; Spare Parts, Lift Station-60P; Startup Services, Lift Station-60P; Control Panel, Lift Station -60P. 2 EA of Pumps, Lift Station-62P; Parts Lift Station-62P; Spare Parts, Lift Station-62P; Startup Services, Lift Station-62P; Control Panel, Lift Station -62P.
Posted Date
Jan 4, 2026
Due Date
Feb 5, 2026
Release: Jan 4, 2026
Close: Feb 5, 2026
2 EA of Pumps, Lift Station-60P; Parts Lift Station-60P; Spare Parts, Lift Station-60P; Startup Services, Lift Station-60P; Control Panel, Lift Station -60P. 2 EA of Pumps, Lift Station-62P; Parts Lift Station-62P; Spare Parts, Lift Station-62P; Startup Services, Lift Station-62P; Control Panel, Lift Station -62P.
AvailableWork includes lift station improvements consisting of the replacement of two vacuum prime wastewater pumping stations including new suction and discharge piping and supports and miscellaneous appurtenances.
Posted Date
Dec 12, 2025
Due Date
Jan 14, 2026
Release: Dec 12, 2025
Close: Jan 14, 2026
Work includes lift station improvements consisting of the replacement of two vacuum prime wastewater pumping stations including new suction and discharge piping and supports and miscellaneous appurtenances.
AvailableWork includes construction of a new sanitary sewer lift station and associated lift station appurtenances. Construction of an 8" gravity sewer line from existing lift station to new lift station. Construction of a 4" force main from existing lift station to new lift station. Demolition of the existing lift station and associated lift station appurtenances. Also includes 1 LS of barricades, signs and traffic handling; 1 LS of demolish existing lift station and appurtenances; 288 LF of 8" SDR 26 PVC gravity sewer line; see attached files.
Posted Date
Jan 8, 2026
Due Date
Feb 5, 2026
Release: Jan 8, 2026
Close: Feb 5, 2026
Work includes construction of a new sanitary sewer lift station and associated lift station appurtenances. Construction of an 8" gravity sewer line from existing lift station to new lift station. Construction of a 4" force main from existing lift station to new lift station. Demolition of the existing lift station and associated lift station appurtenances. Also includes 1 LS of barricades, signs and traffic handling; 1 LS of demolish existing lift station and appurtenances; 288 LF of 8" SDR 26 PVC gravity sewer line; see attached files.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis