Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes construction of a new sanitary sewer lift station and associated lift station appurtenances. Construction of an 8" gravity sewer line from existing lift station to new lift station. Construction of a 4" force main from existing lift station to new lift station. Demolition of the existing lift station and associated lift station appurtenances. Also includes 1 LS of barricades, signs and traffic handling; 1 LS of demolish existing lift station and appurtenances; 288 LF of 8" SDR 26 PVC gravity sewer line; see attached files.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide lift station wet well platform replacement.
Posted Date
Dec 22, 2025
Due Date
Jan 9, 2026
Release: Dec 22, 2025
Close: Jan 9, 2026
Provide lift station wet well platform replacement.
Project involves the replacement of an existing small wastewater lift station. Demolition of existing lift station, including removing existing lift station, removing pavements, removing existing equipment and piping, complete in place; Package Lift Station, includes Pumps, Piping, Fittings, Guide Rails, Lift Chains, Vent, Hatches, Valves, Valve Pit, Electrical Equipment Installation including, but not limited to: lift station control panel, terminal boxes, main breaker, manual transfer switch, conduit, wire, and all ancillary devices; 10 LF Proposed 2" PVC SCHED 40 Sanitary Sewer Force Main;
Posted Date
Dec 11, 2025
Due Date
Jan 15, 2026
Release: Dec 11, 2025
Close: Jan 15, 2026
Project involves the replacement of an existing small wastewater lift station. Demolition of existing lift station, including removing existing lift station, removing pavements, removing existing equipment and piping, complete in place; Package Lift Station, includes Pumps, Piping, Fittings, Guide Rails, Lift Chains, Vent, Hatches, Valves, Valve Pit, Electrical Equipment Installation including, but not limited to: lift station control panel, terminal boxes, main breaker, manual transfer switch, conduit, wire, and all ancillary devices; 10 LF Proposed 2" PVC SCHED 40 Sanitary Sewer Force Main;
AvailableFalls County, on behalf of the Chilton Water Supply and Sewer Service Corporation, is soliciting bids for TxCDBG Project No. CDV23-0043 to install a generator for a lift station and perform wastewater treatment facility improvements in Chilton, Texas. Bids are due at 10:00 AM CST on January 30, 2026 at the Chilton Volunteer Fire Department, with a non-mandatory pre-bid meeting at the wastewater treatment plant on January 16, 2026. Bid documents are available via CivCast at no charge, and the project is subject to Davis-Bacon and Build America, Buy America requirements.
Posted Date
Jan 7, 2026
Due Date
Jan 30, 2026
Release: Jan 7, 2026
Close: Jan 30, 2026
Falls County, on behalf of the Chilton Water Supply and Sewer Service Corporation, is soliciting bids for TxCDBG Project No. CDV23-0043 to install a generator for a lift station and perform wastewater treatment facility improvements in Chilton, Texas. Bids are due at 10:00 AM CST on January 30, 2026 at the Chilton Volunteer Fire Department, with a non-mandatory pre-bid meeting at the wastewater treatment plant on January 16, 2026. Bid documents are available via CivCast at no charge, and the project is subject to Davis-Bacon and Build America, Buy America requirements.
Work includes approx 1 LS construction of MM lift station; 40 LF 4" PVC C900 pressure sewer line; 1 EA 20" chain link fence gates. See outside link.
Posted Date
Dec 19, 2025
Due Date
Jan 13, 2026
Release: Dec 19, 2025
Close: Jan 13, 2026
Work includes approx 1 LS construction of MM lift station; 40 LF 4" PVC C900 pressure sewer line; 1 EA 20" chain link fence gates. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis