Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Livingston Parish Sewer Districts 1 & 2's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Livingston Parish Sewer Districts 1 & 2
Requesting a quote to perform emergency pump station repairs and site improvements - contractor is responsible for temporary bypass of sewage during the rehabilitation of this pump station. Temporary bypass shall be from upstream manhole. To facilitate station bypass, contractor shall install plugs as necessary at the pump station and a temporary tap downstream to provide for continuous flow from upstream systems. Contractor is responsible for providing temporary power to the site and will transfer at the end of the project a complete working pump station with electrical service in place. Contractor shall ensure that proper erosion control measures (such as hay bales and/or silt fences) are used to prevent silt and material from disturbed areas from entering stormwater systems or canal tributaries; etc, see outside link.
Posted Date
Jan 7, 2026
Due Date
Jan 15, 2026
Release: Jan 7, 2026
Livingston Parish Sewer Districts 1 & 2
Close: Jan 15, 2026
Requesting a quote to perform emergency pump station repairs and site improvements - contractor is responsible for temporary bypass of sewage during the rehabilitation of this pump station. Temporary bypass shall be from upstream manhole. To facilitate station bypass, contractor shall install plugs as necessary at the pump station and a temporary tap downstream to provide for continuous flow from upstream systems. Contractor is responsible for providing temporary power to the site and will transfer at the end of the project a complete working pump station with electrical service in place. Contractor shall ensure that proper erosion control measures (such as hay bales and/or silt fences) are used to prevent silt and material from disturbed areas from entering stormwater systems or canal tributaries; etc, see outside link.
AvailableLivingston Parish Sewer Districts 1 & 2
Emergency repair contract.
Posted Date
Jun 25, 2025
Due Date
Jul 31, 2025
Release: Jun 25, 2025
Livingston Parish Sewer Districts 1 & 2
Close: Jul 31, 2025
Emergency repair contract.
Livingston Parish Sewer Districts 1 & 2
Emergency Pipe and Valve Supply Contract.
Posted Date
Jun 25, 2025
Due Date
Jul 31, 2025
Release: Jun 25, 2025
Livingston Parish Sewer Districts 1 & 2
Close: Jul 31, 2025
Emergency Pipe and Valve Supply Contract.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.