Black HDPE Pipe and Pipe Parts
Purchase of black HDPE pipe and pipe parts.
Description: Work includes PVC and HDPE sewer force main pipe construction.
SpecialDistrict · LA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
Las Vegas Valley Water District
Special DistrictNV
Posted
Sep 24, 2026
Oct 12, 2026
Purchase of black HDPE pipe and pipe parts.
Special DistrictNC
Posted
Sep 22, 2026
Oct 26, 2026
Construction of the Southwest Wastewater Pump Station and Force Main will be received by Harnett Regional Water. The project consists of one (1) contract with two (2) sections. Section A includes the upgrade of the existing SLS #57 sewer pump station including headworks modifications, replacement of two (2) existing 100 HP submersible pumps, new lime feed system, and electrical, SCADA, and controls. Section B includes the installation of 26,220 LF of 20” sewer force main, and all appurtenances. The project shall include all sitework, piping, fittings, valves, appurtenances, and other items required.
Special DistrictAR
Posted
Sep 27, 2026
Oct 14, 2026
The project consists of installation of approx. 15,500 LF of sanitary sewer main, ranging in size from 8" to 36" dia., with trenching depths ranging from 6' to 20'. Installation methods shall mainly be open cut, with some sections installed by auger bore or pipe bursting methods. Manholes and diversion boxes will be epoxy lined. Also includes 15 LF of 8" PVC SDR-26 sewer line 8' - 10' depth; 1003 LF of pipe bursting trenchless replacement of 8" PVC main with 12" HDPE DR17 main.
CityMA
Posted
Sep 30, 2026
Oct 14, 2026
Main street sewer rehabilitation project. The work to be done under this contract includes, but is not necessarily limited to, installation of approx., 4,000 LF of cured-in-place pipe (CIPP) lining in existing 8" through 15" gravity sewer mains and geopolymer lining of approx., 24 existing sewer manholes, together with sewer cleaning, CCTV inspection, temporary bypass pumping, traffic control, pavement restoration, and all appurtenant work required to complete the improvements.