CountyCA
Posted
Jun 12, 2025
Nov 5, 2026
Eureka Canyon Road PM 8.11 and 8.39 Storm Damage Repair Projects *Re-Bid*
Work includes 40 LF temporary railing (type k); 2 EA temporary crash cusion; 1 LS prepare water pollution control plan; 86 LF temporary high-visibility fence; 1 LS invasive species control; 1 LS clearing and grubbing; 20 CY clearing and grubbing; 31 CY roadway excavation; 20 CY structure excavation (soldier pile wall); 25 CY structure backfill (soldier pile wall)l; 44 CY concrete backfill (soldier pile wall); 22 CY lean concrete backfill; 2 CY debris removal/clean ditch; 635 sf hydroseed; 15 TON hot mix asphalt (type a); 66 SY cold plane asphalt concrete pavement; 38 LF place hot mix asphalt dike (type f). See outside link.
