Repair Storm Damage Imperial Dam Road at YPG, AZ RFP
Posted
Oct 14, 2026
Oct 21, 2026
DESIGN-BUILD construction contract for repair the dam road by reconstruction of an approx. 4,505-FT-long roadway, raising grade, constructing culverts, regrading wash areas and ditches to account for current stormwater runoff. Create positive ditch drainage in areas of reconstruction. The final surface shall be a smooth profile without any bumps or dips. Replace all signs, install new wet reflective thermoplastic pavement markings and retroreflective pavement markers.
