Nevada Department of Administration
State AgencyNV
Posted
Nov 10, 2026
Dec 8, 2026
Clean Water Technical Assistance RFP
Qualified vendors to provide well repair services. The goal and objective is to secure services to fix the well and restore/repair services to the well meter so that NYTC can accurately provide the required reporting of water usage. Replace 4inch water main, meter and check valve at NYTC Well house: Replace 4โ Ductile Iron from 4โ Romac coupling and install new 4โ MJ coupling and C-900 DR-14 pipe into concrete vault; Replace 4โ Flanged Water Meter; Install 4โ C-900 DR-14 with 4โ x 1โ saddle tap/1โ Ball Valve and 1โ Air Vent with associated 1โ pipe nipples; Install 4โ C-900 DR-14 with 2nd 4โ x 1โ saddle tap/pipe nipple and ball valve for sampling port; Install 4โ Silent Check Valve inside vault; Install 3rd 4โ x 1โ saddle tap/1โ SCH 80 pipe nipple and 1โ SCH 80 ball valve for chlorine injection after check valve inside vault. Install 4โ C-900 DR-14 from check valve to existing pipe with new 4โ MJ coupling outside of the vault; Fully seal vault penetrations; Perform water leak test; Shade all pipe with sand, backfill and compact all ditches and reset valve boxes; Equipment to be provided by the contractor; Remove all debris from job site.
