Summary
Work includes 1 LS renovations to hole 1 green complex; 1 LS construction of left fairway bunker at hole 16; 329,500 SF total area of disturbance including haul roads, stockpile areas and all other disturbance ; 650 ton total sand salvaged from existing bunkers ; 2,400 CY total topsoil to be stripped, stockpiled, and respread; 1,100 SF practice bunker target ; 290 ton capillary concrete bunker liner; 900 ton bunker sand (average 5" depth; 3,100 LF 4" diam. Drain line (perf. ); 3,700 LF 4" diam drain line ( non-perf. ); 720 LF 6" Diam. Drain line (non-perf); 4 unit 4" diam drain inlet with plastic grate. See outside link.