Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Request for Proposal for engineering services to design the replacement of the HVAC system at Matoaka Elementary School.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide qualified architecture/engineering firms to produce detailed designs, construction drawings, specifications and contract documents, and to obtain the necessary related regulatory approvals for replacement of the heating ventilating and air conditioning (HVAC) system.
Posted Date
Jan 13, 2026
Due Date
Mar 6, 2026
Release: Jan 13, 2026
Close: Mar 6, 2026
Provide qualified architecture/engineering firms to produce detailed designs, construction drawings, specifications and contract documents, and to obtain the necessary related regulatory approvals for replacement of the heating ventilating and air conditioning (HVAC) system.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project consists of: removal and replacement of rooftop HVAC equipment at Oster elementary school.
Posted Date
Dec 29, 2025
Due Date
Feb 10, 2026
Release: Dec 29, 2025
Close: Feb 10, 2026
The project consists of: removal and replacement of rooftop HVAC equipment at Oster elementary school.
AvailableWork includes HVAC, open space enclosure and roof replacement.
Posted Date
Nov 25, 2025
Due Date
Jan 21, 2026
Release: Nov 25, 2025
Close: Jan 21, 2026
Work includes HVAC, open space enclosure and roof replacement.
AvailableBerkeley County School District invites bids to provide and install new HVAC systems at Boulder Bluff Elementary School in accordance with the specifications and drawings. A mandatory pre-bid/site visit is required as listed in the solicitation. Bids are due February 9, 2026 at 2:00 pm local time.
Posted Date
Jan 16, 2026
Due Date
Feb 9, 2026
Release: Jan 16, 2026
Close: Feb 9, 2026
Berkeley County School District invites bids to provide and install new HVAC systems at Boulder Bluff Elementary School in accordance with the specifications and drawings. A mandatory pre-bid/site visit is required as listed in the solicitation. Bids are due February 9, 2026 at 2:00 pm local time.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →