Closing soon

Prequalification - Elm Street Waterline Replacement - Woodstock

Description: Prequalification for Replacement of an existing water main line along Elm Street in Woodstock, Vermont. Specifically, the work will include trenching, removal of the existing asphalt and subbase, installation of water main, thrust blocks, valves, securing insulated water main attached the existing bridge substructure, installation of roadway base and pavement patch and associated site work, sandblasting, cleaning, and painting of the bridge substructure.

Buyer
Town of Woodstock

City · VT, US

Released
Nov 2, 2026
Closes
Nov 23, 2026(12 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts