Project consists of waterline replacement.
Description: Prequalification for Replacement of an existing water main line along Elm Street in Woodstock, Vermont. Specifically, the work will include trenching, removal of the existing asphalt and subbase, installation of water main, thrust blocks, valves, securing insulated water main attached the existing bridge substructure, installation of roadway base and pavement patch and associated site work, sandblasting, cleaning, and painting of the bridge substructure.
City · VT, US
From the first pre-RFP signals to the published RFP and its files.
Agenda packet
300 days before RFP
Abbie Sherman's memo reported that the grant-funded Elm Street Bridge waterline was ready for bidding but required a federal environmental assessment first, with bidding ideally by the end of June 2026.
NBRC Grant- Water System Projects Award Amount. $86,235.70 Town Share: $868,858.52 Abbreviatlons: Elm Street Brdge LIne SCRP Project Costs Breakdown: $979,999.55 Total: $1,755,094.22 Supply Well Replacment $837,717.50 Relmbursement Aate: 50% EA = Envlronmental Assessment Perlod of Performance: 7/1/2025 to 09/30/2028 SHPO = State Historic Presevation Ofice…
Town Of Woodstock Selectboard Special Selectboard Meeting
Agenda packet · Jan 6, 2026
Board meeting
286 days before RFP
The Selectboard approved an NBRC grant amendment maintaining Elm Street Bridge construction while removing new-well design and permitting, with option 5 as backup.
Potential Amendment to NBRC Grant The board discussed options for the NBRC grant that Abbie Sherman, Economic Development Director, had previously presented. Cliff Johnson recommended option 2, and Laura Powell agreed, suggesting option 5 as a backup. Abbie Sherman confirmed option 2 was viable but would take time to implement. Option 2 would remove the…
Town Of Woodstock Selectboard Selectboard Meeting Minutes
Board meeting · Jan 20, 2026
Board meeting
76 days before RFP
Bids for the Elm Street pipe project were due the following Tuesday, with a bid proposal expected before the Selectboard in September.
• He noted that bids for the Elm Street pipe project were due the following Tuesday, with a bid proposal expected before the Selectboard at the first September meeting.
Town Of Woodstock Selectboard Selectboard Meeting
Board meeting · Aug 18, 2026
Agenda packet
13 days before RFP
The Town reported that the Elm Street water main project would be rebid for spring construction under revised day-work conditions, with funding fully in place.
Mica Seeley of the South Woodstock Halloween volunteer committee requested closure of Route 106 for approximately two hours on Sunday, October 25th, from 3:00 to 5:00 PM, to safely accommodate the annual community event. It was noted that closing a state highway requires coordination with the State. The Board discussed alternatives, including a single-lane…
RFP published
Proposals due (12 days left)
Elm Street Pipe Replacement: Bids for the Elm Street pipe replacement project were to go live at the end of the week, with a target of completing pipe installation under the bridge before Thanksgiving.
Town of Woodstock Selectboard Selectboard Meeting
Board meeting · Jul 27, 2026
Town of Woodstock Selectboard Selectboard Meeting
Agenda packet · Oct 20, 2026
Decision makers connected to this RFP from Town of Woodstock.
Adjacent opportunities open for bidding right now.
CityMS
Posted
Oct 29, 2026
Dec 10, 2026
Project consists of waterline replacement.
CitySC
Posted
Oct 14, 2026
Nov 19, 2026
The project generally consists of the installation of approx. 1,475 LF of 6" DIP waterline, 2 fire hydrants, valves, asphalt replacement, service reconnections, connections to the existing water system, and other necessary appurtenances and work tasks required for a complete installation.
CityOH
Posted
Nov 5, 2026
Nov 20, 2026
Work consists of the replacement of approx 920 LF of 8" cast iron waterline with 8" DI pipe; 2,653 LF of west maple will then be reconstructed including new 304 aggregate, full depth asphalt pavement, concrete driveway aprons, concrete curb and gutter, shallow pipe underdrain, select concrete sidewalk replacement, and thermoplastic pavement markings. Lastly, approx 515 LF of west maple between whipple avenue nw and wise will be milled and repaved.
CityFL
Posted
Jul 22, 2025
Jun 24, 2030
The City of Miami Beach seeks qualified elevator contractors to join a prequalification pool for elevator replacement and modernization services, including removal, disposal, and installation to meet current building codes and ADA requirements. Inclusion in the pool is a prerequisite to receive invitations to quote and be considered for project work over the stated term.