San Jose-Evergreen Community College District
Higher EducationCA
Posted
Aug 20, 2026
Sep 22, 2026
SJCC Elevator Modernization Phase 2
Modernization of three (3) hydraulic passenger elevators in three different buildings. Work includes new microprocessor-based controller, new hydraulic unit, new machine room and hoist way wiring, machine room ventilation fan, new digital landing system, heavy duty style door operator and associated equipment, new spring-loaded roller guides, new signal & operating fixtures, heat detectors, shunt trips, pit lighting, and cab upgrades.