Connecticut State Contracting Standards Board
State AgencyCT
Jul 2, 2026
Closes
Aug 20, 2026
Elevator Installation and Modernization
Installation of a new elevator and modernization of an existing elevator at a Judical Branch.
Description: The Northeast Ohio Regional Sewer District is soliciting sealed bids for Districtwide Elevator Modernization under Project ID EB-2514. The work includes repairs, painting, controls updates, cab improvements, and complete modernization of elevators at multiple wastewater treatment and administrative facilities. This Invitation For Bid was released on August 11, 2026, with a non-mandatory pre-bid meeting on August 25 and bid opening on September 15, 2026, at 1:00 p.m. Eastern Time.
SpecialDistrict · OH, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
Connecticut State Contracting Standards Board
State AgencyCT
Jul 2, 2026
Closes
Aug 20, 2026
Installation of a new elevator and modernization of an existing elevator at a Judical Branch.
Maryland Transit Administration
State AgencyMD
Feb 26, 2026
Closes
Aug 28, 2026
DESIGN-BUILD proposals for the modernization of forty (40) elevators within the mdot mta's system, including: design, construction, installation, commissioning, and certification of the new equipment.
CityWA
Jul 24, 2026
Closes
Aug 25, 2026
Work consists of modernization of two machine room less traction elevators including, but not limited to, new systems and components and other work.
University Of California At Los Angeles
Higher EducationCA
Jul 14, 2026
Closes
Aug 18, 2026
This project will upgrade and modernize the elevators at UCLA Westwood Center, which consist of three traction and two hydraulic elevators. The proposed scope of work for the three traction elevators includes the installation of new solid-state controllers, variable-voltage variable-frequency drives, traction hoist machines, car and hall fixtures, seismic components, governors, traveling cables, motor room and hoistway wiring, car and counterweight roller guides, car door operator, fire return system, hoistway door equipment, shaft limits, detector edges, and pit devices. For the two hydraulic elevators, the scope of work includes the installation of a new microprocessor controller, pump/power unit, closed-loop door operator, hall door tracks and hangers, in-ground jack unit with polyvinyl chloride (PVC) liner, rupture valve, car and hall fixtures, machine room and hoistway wiring, traveling cables, limit switches, roller guides, detector edges, pit devices, fire return system, and car communication.
Procurement and program contacts connected to Northeast Ohio Regional Sewer District.