Wisconsin Department of Administration
State AgencyWI
Aug 11, 2026
Closes
Sep 23, 2026
Medium Voltage Transformer Replacement RFP
This project re-builds existing medium voltage unit substation damaged by transformer fire during Fall 2025. Unit substation is located inside medium voltage electrical room. Project replaces unit substation transformer and cleans/maintains associated fused load interrupter switch. Project replaces medium voltage cables from exterior pad mounted switch to unit substation transformer. Project replaces secondary conductors from unit substation transformer to main distribution switchboard. Project also removes temporary normal power equipment and wiring installed after fire event.