Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The State of North Carolina (Gaston College) issued a solicitation to provide and install electrical and plumbing connections to support yarn equipment at the Fiber Innovation Center (Kimbrell Campus). The scope includes installing three compressed air drops, three electrical circuits, a new transformer and service panel, cleanup, repairs for damages, corrections to meet inspection standards, and training/owner walk-through. Work is to commence after bid opening on Jan 28, 2026, with performance at Gaston College - Kimbrell Campus (7224 Wilkinson Blvd., Belmont, NC).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide services for the installation of new process equipment components being installed in the fiber innovation center building. The chilled water system will be comprised of the following: 1. Provide and install one knockdown tank, 304 stainless-steel, adequate connections indicated on the piping plan. 2. Balance existing exhaust fan to cfm indicated on the plans, or remove existing and provide and install new roof mounted exhaust fan as indicated. Replace portion of window with makeup damper/louver. 3. Provide and install new stainless-steel piping as indicated on the plans from the various equipment connections to the knockdown tank. Piping shall be routed tight to walls to avoid trip hazard.
Posted Date
Dec 18, 2025
Due Date
Jan 28, 2026
Release: Dec 18, 2025
Close: Jan 28, 2026
Provide services for the installation of new process equipment components being installed in the fiber innovation center building. The chilled water system will be comprised of the following: 1. Provide and install one knockdown tank, 304 stainless-steel, adequate connections indicated on the piping plan. 2. Balance existing exhaust fan to cfm indicated on the plans, or remove existing and provide and install new roof mounted exhaust fan as indicated. Replace portion of window with makeup damper/louver. 3. Provide and install new stainless-steel piping as indicated on the plans from the various equipment connections to the knockdown tank. Piping shall be routed tight to walls to avoid trip hazard.
AvailableLit or dark fiber connections.
Posted Date
Dec 18, 2025
Due Date
Feb 12, 2026
Release: Dec 18, 2025
Close: Feb 12, 2026
Lit or dark fiber connections.
AvailableUniversity Hospital is proposing a needed service to provide for the endoscopic surgical video towers and equipment, aimed at replacing outdated equipment in the Ambulatory Surgical Center (ASC). To facilitate this installation in the operating room's integration suites, labor and fiber optic cabling will be necessary. The fiber optic cabling is essential for ensuring that the ConMed equipment is compatible with the integration platform.
Posted Date
Jan 8, 2026
Due Date
Jan 30, 2026
Release: Jan 8, 2026
Close: Jan 30, 2026
University Hospital is proposing a needed service to provide for the endoscopic surgical video towers and equipment, aimed at replacing outdated equipment in the Ambulatory Surgical Center (ASC). To facilitate this installation in the operating room's integration suites, labor and fiber optic cabling will be necessary. The fiber optic cabling is essential for ensuring that the ConMed equipment is compatible with the integration platform.
Seeking to procure labor and materials for fiber optic installation services city wide to support our public parks wi-fi expansion.
Posted Date
Nov 12, 2025
Due Date
Jan 26, 2026
Release: Nov 12, 2025
Close: Jan 26, 2026
Seeking to procure labor and materials for fiber optic installation services city wide to support our public parks wi-fi expansion.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis