Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of improvements to the electrical system of the pump station. The work includes the installation of a new standby generator with an automatic transfer switch, the associated conduit and wiring, gas piping, and a scada system for remote monitoring.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project Work will be performed under two (2) contracts: one (1) general construction contract and one (1) electrical construction contract. The work for Contract No. 1: General Construction generally includes temporary removal and reinstallation of fencing to facilitate completion of work; bypass pumping to maintain flows around pump station to facilitate completion of work; removal of external piping where indicated; demolition of existing valve vault; removal of existing LP tank and tubing; trim tree limbs and branches around existing utility pole and refasten/tension existing guy cables; selective demolition of existing wet well; installation of internal wet well components; installation of new wet well lid; installation of concrete platform for package lift station; installation of package pump station to be furnished by the Owner; installation of float control measures to be furnished by the Owner, including connecting wiring into pump control panel; Alternate #1 (if selected): lining of the wet well interior; installation of wet well aeration system, concrete pad, and aeration piping; installation of new LP tank, concrete pad, and LP tubing; installation of new force main piping, fittings, and valves where indicated on the plans; installation of pipe bollard; trenching, backfill, and compaction; installation of ESC controls; and all incidental work required to complete the Project, as shown in the Drawings and described in the Contract Documents. The work for Contract No. 2: Electrical Construction generally includes removal of existing low voltage service raceways and wiring that are no longer intended for use; removal and storage of existing automatic transfer switch and Omnisite unit; removal of existing pump control panel and all associated raceways/wiring; removal of junction box and associated raceways and wiring; installation of new electrical service entrance equipment, including strut rack and cantilevered canopy with fusible heavy duty safety switch; installation of conduit/wiring; installation of mounting supports and hardware to mount the aeration motor control panel; installation of mounting supports and hardware to mount the reinstalled Omnisite unit; installation of seal off fittings; reinstall automatic transfer switch on strut rack and cantilevered canopy with non-fused heavy duty safety switch painting of mounting equipment/hardware; and all incidental work.
Posted Date
Dec 19, 2025
Due Date
Feb 13, 2026
Release: Dec 19, 2025
Close: Feb 13, 2026
Project Work will be performed under two (2) contracts: one (1) general construction contract and one (1) electrical construction contract. The work for Contract No. 1: General Construction generally includes temporary removal and reinstallation of fencing to facilitate completion of work; bypass pumping to maintain flows around pump station to facilitate completion of work; removal of external piping where indicated; demolition of existing valve vault; removal of existing LP tank and tubing; trim tree limbs and branches around existing utility pole and refasten/tension existing guy cables; selective demolition of existing wet well; installation of internal wet well components; installation of new wet well lid; installation of concrete platform for package lift station; installation of package pump station to be furnished by the Owner; installation of float control measures to be furnished by the Owner, including connecting wiring into pump control panel; Alternate #1 (if selected): lining of the wet well interior; installation of wet well aeration system, concrete pad, and aeration piping; installation of new LP tank, concrete pad, and LP tubing; installation of new force main piping, fittings, and valves where indicated on the plans; installation of pipe bollard; trenching, backfill, and compaction; installation of ESC controls; and all incidental work required to complete the Project, as shown in the Drawings and described in the Contract Documents. The work for Contract No. 2: Electrical Construction generally includes removal of existing low voltage service raceways and wiring that are no longer intended for use; removal and storage of existing automatic transfer switch and Omnisite unit; removal of existing pump control panel and all associated raceways/wiring; removal of junction box and associated raceways and wiring; installation of new electrical service entrance equipment, including strut rack and cantilevered canopy with fusible heavy duty safety switch; installation of conduit/wiring; installation of mounting supports and hardware to mount the aeration motor control panel; installation of mounting supports and hardware to mount the reinstalled Omnisite unit; installation of seal off fittings; reinstall automatic transfer switch on strut rack and cantilevered canopy with non-fused heavy duty safety switch painting of mounting equipment/hardware; and all incidental work.
Miami-Dade Water and Sewer Department is soliciting contractors for storm hardening upgrades at Pump Station No.1, including flood-proofing building openings, hardening exterior equipment, ventilation improvements, and related civil, mechanical, electrical and instrumentation work. The project requires contractors with wastewater facility and sodium hypochlorite storage experience and appropriate general/building and specialty licenses; a mandatory pre-bid meeting/site visit is scheduled. Construction is expected to begin in April 2026 and last approximately 400 calendar days.
Posted Date
Jan 15, 2026
Due Date
Mar 5, 2026
Release: Jan 15, 2026
Close: Mar 5, 2026
Miami-Dade Water and Sewer Department is soliciting contractors for storm hardening upgrades at Pump Station No.1, including flood-proofing building openings, hardening exterior equipment, ventilation improvements, and related civil, mechanical, electrical and instrumentation work. The project requires contractors with wastewater facility and sodium hypochlorite storage experience and appropriate general/building and specialty licenses; a mandatory pre-bid meeting/site visit is scheduled. Construction is expected to begin in April 2026 and last approximately 400 calendar days.
AvailableReplacement of pumps, booster pump control valves, steel piping, pipe supports, valves, painting and coating, wet well top slab, motor control center, supervisory control and data acquistion - remote terminal unit (SCADA-RTU), installation of a hydropneumatic tank and air compressor, and patching of metal siding, insulation and drywall.
Posted Date
Nov 26, 2025
Due Date
Jan 26, 2026
Release: Nov 26, 2025
Close: Jan 26, 2026
Replacement of pumps, booster pump control valves, steel piping, pipe supports, valves, painting and coating, wet well top slab, motor control center, supervisory control and data acquistion - remote terminal unit (SCADA-RTU), installation of a hydropneumatic tank and air compressor, and patching of metal siding, insulation and drywall.
AvailableThe Town of Winthrop seeks quotes from qualified contractors to repair and upgrade the Winthrop Street Sewer Pump Station. Work includes bypass pumping as needed, pump station cleanout, removal of existing grinder pumps and associated bases/rails, and installation of new pump bases/guide rails, check valves, two Barnes PS submersible grinder pumps, and new discharge piping. The contractor will perform startup and testing of the new system; procurement documents are available via the Town’s bid portal to plan holders.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
The Town of Winthrop seeks quotes from qualified contractors to repair and upgrade the Winthrop Street Sewer Pump Station. Work includes bypass pumping as needed, pump station cleanout, removal of existing grinder pumps and associated bases/rails, and installation of new pump bases/guide rails, check valves, two Barnes PS submersible grinder pumps, and new discharge piping. The contractor will perform startup and testing of the new system; procurement documents are available via the Town’s bid portal to plan holders.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →