Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Strasburg Borough Authority's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Strasburg Borough Authority
Project Work will be performed under two (2) contracts: one (1) general construction contract and one (1) electrical construction contract. The work for Contract No. 1: General Construction generally includes temporary removal and reinstallation of fencing to facilitate completion of work; bypass pumping to maintain flows around pump station to facilitate completion of work; removal of external piping where indicated; demolition of existing valve vault; removal of existing LP tank and tubing; trim tree limbs and branches around existing utility pole and refasten/tension existing guy cables; selective demolition of existing wet well; installation of internal wet well components; installation of new wet well lid; installation of concrete platform for package lift station; installation of package pump station to be furnished by the Owner; installation of float control measures to be furnished by the Owner, including connecting wiring into pump control panel; Alternate #1 (if selected): lining of the wet well interior; installation of wet well aeration system, concrete pad, and aeration piping; installation of new LP tank, concrete pad, and LP tubing; installation of new force main piping, fittings, and valves where indicated on the plans; installation of pipe bollard; trenching, backfill, and compaction; installation of ESC controls; and all incidental work required to complete the Project, as shown in the Drawings and described in the Contract Documents. The work for Contract No. 2: Electrical Construction generally includes removal of existing low voltage service raceways and wiring that are no longer intended for use; removal and storage of existing automatic transfer switch and Omnisite unit; removal of existing pump control panel and all associated raceways/wiring; removal of junction box and associated raceways and wiring; installation of new electrical service entrance equipment, including strut rack and cantilevered canopy with fusible heavy duty safety switch; installation of conduit/wiring; installation of mounting supports and hardware to mount the aeration motor control panel; installation of mounting supports and hardware to mount the reinstalled Omnisite unit; installation of seal off fittings; reinstall automatic transfer switch on strut rack and cantilevered canopy with non-fused heavy duty safety switch painting of mounting equipment/hardware; and all incidental work.
Posted Date
Dec 19, 2025
Due Date
Feb 13, 2026
Release: Dec 19, 2025
Strasburg Borough Authority
Close: Feb 13, 2026
Project Work will be performed under two (2) contracts: one (1) general construction contract and one (1) electrical construction contract. The work for Contract No. 1: General Construction generally includes temporary removal and reinstallation of fencing to facilitate completion of work; bypass pumping to maintain flows around pump station to facilitate completion of work; removal of external piping where indicated; demolition of existing valve vault; removal of existing LP tank and tubing; trim tree limbs and branches around existing utility pole and refasten/tension existing guy cables; selective demolition of existing wet well; installation of internal wet well components; installation of new wet well lid; installation of concrete platform for package lift station; installation of package pump station to be furnished by the Owner; installation of float control measures to be furnished by the Owner, including connecting wiring into pump control panel; Alternate #1 (if selected): lining of the wet well interior; installation of wet well aeration system, concrete pad, and aeration piping; installation of new LP tank, concrete pad, and LP tubing; installation of new force main piping, fittings, and valves where indicated on the plans; installation of pipe bollard; trenching, backfill, and compaction; installation of ESC controls; and all incidental work required to complete the Project, as shown in the Drawings and described in the Contract Documents. The work for Contract No. 2: Electrical Construction generally includes removal of existing low voltage service raceways and wiring that are no longer intended for use; removal and storage of existing automatic transfer switch and Omnisite unit; removal of existing pump control panel and all associated raceways/wiring; removal of junction box and associated raceways and wiring; installation of new electrical service entrance equipment, including strut rack and cantilevered canopy with fusible heavy duty safety switch; installation of conduit/wiring; installation of mounting supports and hardware to mount the aeration motor control panel; installation of mounting supports and hardware to mount the reinstalled Omnisite unit; installation of seal off fittings; reinstall automatic transfer switch on strut rack and cantilevered canopy with non-fused heavy duty safety switch painting of mounting equipment/hardware; and all incidental work.
AvailableStrasburg Borough Authority
The principal items of work to be performed under the contract are: 1) sawcutting of existing pavement for trench excavation; 2) removal of existing curb and sidewalk; 3) removal of existing stormwater structures and pipes; 4) installation of new stormwater structures and associated pipes; 5) installation of new curb and sidewalk; 6) trench backfill and compacting; 7) installation of proposed pavement section.
Posted Date
Aug 29, 2025
Due Date
Oct 14, 2025
Release: Aug 29, 2025
Strasburg Borough Authority
Close: Oct 14, 2025
The principal items of work to be performed under the contract are: 1) sawcutting of existing pavement for trench excavation; 2) removal of existing curb and sidewalk; 3) removal of existing stormwater structures and pipes; 4) installation of new stormwater structures and associated pipes; 5) installation of new curb and sidewalk; 6) trench backfill and compacting; 7) installation of proposed pavement section.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.