Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Beaver Water & Sewer Authority
Headworks & Electric Improvements Project: Contract 2025-01 – General/Mechanical Construction; Contract 2025-02 – Electrical Construction. The Project includes the following Work: Removal of existing aeration systems within various treatment basins and their associated air piping systems. Selective demolition of support piers, metal walkways, and air piping within existing aeration basins. Construction of a new electrical control building. Installation of various aeration basin blowers, piping, air diffusers and associated equipment. Removal and replacement of existing mechanical screen and grit removal equipment within the Headworks Building.
Posted Date
Dec 10, 2025
Due Date
Jan 28, 2026
Release: Dec 10, 2025
Beaver Water & Sewer Authority
Close: Jan 28, 2026
Headworks & Electric Improvements Project: Contract 2025-01 – General/Mechanical Construction; Contract 2025-02 – Electrical Construction. The Project includes the following Work: Removal of existing aeration systems within various treatment basins and their associated air piping systems. Selective demolition of support piers, metal walkways, and air piping within existing aeration basins. Construction of a new electrical control building. Installation of various aeration basin blowers, piping, air diffusers and associated equipment. Removal and replacement of existing mechanical screen and grit removal equipment within the Headworks Building.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Beaver Water & Sewer Authority
The meeting included updates on the relocation of the sanitary system influent line, infiltration and inflow, well field designation, review of audit recommendations, lead lines report, budget, storage tank review, and UV lamps and ballasts. The board discussed and approved a quote for $13110.00. The accounting firm "jmALLC" has rebranded to Butler Agnew & Associates, and the board authorized Butler Agnew & Associates to perform the MA 2025 Accounting audit. An executive session was held to discuss personnel, litigation, and updates.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Beaver Water & Sewer Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database