Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Beaver Water & Sewer Authority's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Beaver Water & Sewer Authority
Headworks & Electric Improvements Project: Contract 2025-01 – General/Mechanical Construction; Contract 2025-02 – Electrical Construction. The Project includes the following Work: Removal of existing aeration systems within various treatment basins and their associated air piping systems. Selective demolition of support piers, metal walkways, and air piping within existing aeration basins. Construction of a new electrical control building. Installation of various aeration basin blowers, piping, air diffusers and associated equipment. Removal and replacement of existing mechanical screen and grit removal equipment within the Headworks Building.
Posted Date
Dec 10, 2025
Due Date
Jan 28, 2026
Release: Dec 10, 2025
Beaver Water & Sewer Authority
Close: Jan 28, 2026
Headworks & Electric Improvements Project: Contract 2025-01 – General/Mechanical Construction; Contract 2025-02 – Electrical Construction. The Project includes the following Work: Removal of existing aeration systems within various treatment basins and their associated air piping systems. Selective demolition of support piers, metal walkways, and air piping within existing aeration basins. Construction of a new electrical control building. Installation of various aeration basin blowers, piping, air diffusers and associated equipment. Removal and replacement of existing mechanical screen and grit removal equipment within the Headworks Building.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.