CityIA
Jul 29, 2026
Closes
Aug 26, 2026
Water System Variable Frequency Drive Replacements
Work generally consists of replacing six variable frequency drives at the Water Treatment Plant, five variable frequency drives at the Booster Station, and three variable frequency drives at Collector Well. See outside link.