Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of full approx. 16570 SY of full depth reclamation; 16,570 SY of type SP 9.5 wearing course mixture (2,C) 3.0 thick; 12,510 SY of type SP 9.5 wearing course mixture (2,C) 1.5 thick; 125,10 SY of type SP 9.5 wearing course mixture (2,C) 2.0 thick; 12,510 SY of type SP 12.5 non wearing course mixture (2,C) 3.0 thick; 1,600 SF of 6" concrete walk; 600 CY of common topsoil borrow (LV); 1,500 LF of 4" double solid line multi-component (WR); 450 SF of crosswalk multi-component (WR).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Approxi 12 City Blocks of Mill and Overlay, 1,700 tons asphalt surfacing, 15,800 SY asphalt milling, 1,000 LF concrete curb & gutter, 2,900 SF concrete sidewalk.
Posted Date
Jan 22, 2026
Due Date
Feb 3, 2026
Release: Jan 22, 2026
Close: Feb 3, 2026
Approxi 12 City Blocks of Mill and Overlay, 1,700 tons asphalt surfacing, 15,800 SY asphalt milling, 1,000 LF concrete curb & gutter, 2,900 SF concrete sidewalk.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Installation of 380 LF of horizontal direction bored 14" HDPE pipe, connection to existing mains in two locations, cut-in tee, valves and appurtenances, surface restoration identified as grass, native shrubs, gravel, and AC Pavement.
Posted Date
Jan 15, 2026
Due Date
Feb 12, 2026
Release: Jan 15, 2026
Close: Feb 12, 2026
Installation of 380 LF of horizontal direction bored 14" HDPE pipe, connection to existing mains in two locations, cut-in tee, valves and appurtenances, surface restoration identified as grass, native shrubs, gravel, and AC Pavement.
AvailableSeeking competitive sealed bids from qualified and experienced contractors for the replacement of the three existing culverts crossing to improve. Work includes the removal of the existing stormwater culverts, installation of new stormwater culvert and new headwalls, ditch regrading, and milling and resurfacing of the affected roadways. Additionally, culverts to be extended beyond the clear zone where necessary to comply with safety and design standards. The project also includes, but is not limited to, activities such as clearing and grubbing, excavation, sodding, grading and paving, curb installation, drainage pipe installation, pavement marking and signing, and site restoration. See attached file for full scope.
Posted Date
Jan 15, 2026
Due Date
Feb 20, 2026
Release: Jan 15, 2026
Close: Feb 20, 2026
Seeking competitive sealed bids from qualified and experienced contractors for the replacement of the three existing culverts crossing to improve. Work includes the removal of the existing stormwater culverts, installation of new stormwater culvert and new headwalls, ditch regrading, and milling and resurfacing of the affected roadways. Additionally, culverts to be extended beyond the clear zone where necessary to comply with safety and design standards. The project also includes, but is not limited to, activities such as clearing and grubbing, excavation, sodding, grading and paving, curb installation, drainage pipe installation, pavement marking and signing, and site restoration. See attached file for full scope.
AvailableThe purpose is the procurement of reconstruction services of two existing storm drain inlets, the installation of one new storm drain inlet, associated connecting storm pipes and restoration of stamped asphalt pavement. See attached file for full scope.
Posted Date
Dec 29, 2025
Due Date
Feb 3, 2026
Release: Dec 29, 2025
Close: Feb 3, 2026
The purpose is the procurement of reconstruction services of two existing storm drain inlets, the installation of one new storm drain inlet, associated connecting storm pipes and restoration of stamped asphalt pavement. See attached file for full scope.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.