Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Covington Water District
Replacing the onsite hypochlorite generation system including the brine and hypochlorite storage tanks, replacing the hot water tank, installing secondary containment coatings and chemical resistance epoxy flooring, replacing the sodium hydroxide vent and fill piping, replacing butterfly valves, demolishing the unused air piping system and backup hypochlorite feed system.
Posted Date
Jun 2, 2026
Due Date
Jul 1, 2026
Release: Jun 2, 2026
Covington Water District
Close: Jul 1, 2026
Replacing the onsite hypochlorite generation system including the brine and hypochlorite storage tanks, replacing the hot water tank, installing secondary containment coatings and chemical resistance epoxy flooring, replacing the sodium hydroxide vent and fill piping, replacing butterfly valves, demolishing the unused air piping system and backup hypochlorite feed system.
AvailableCovington Water District
Construct approx 2,100 LF of 16" DI water main along 164th Avenue Southeast including: Installation of valves and fittings; installation of two pre-packaged pressure reducing valve (PRV) stations; installation of additional 12" pipe loop at the Kentwood High School PRV site; installation of storm drainage systems, electrical conduits and cabinet, and curbing stations; connection to existing water mains at multiple locations with cut-in tees and tie-ins; and surface restoration including asphalt pavement, curb and gutter, sidewalk, and landscaping.
Posted Date
May 18, 2026
Due Date
Jun 3, 2026
Release: May 18, 2026
Covington Water District
Close: Jun 3, 2026
Construct approx 2,100 LF of 16" DI water main along 164th Avenue Southeast including: Installation of valves and fittings; installation of two pre-packaged pressure reducing valve (PRV) stations; installation of additional 12" pipe loop at the Kentwood High School PRV site; installation of storm drainage systems, electrical conduits and cabinet, and curbing stations; connection to existing water mains at multiple locations with cut-in tees and tie-ins; and surface restoration including asphalt pavement, curb and gutter, sidewalk, and landscaping.
Covington Water District
Installation of 380 LF of horizontal direction bored 14" HDPE pipe, connection to existing mains in two locations, cut-in tee, valves and appurtenances, surface restoration identified as grass, native shrubs, gravel, and AC Pavement.
Posted Date
Jan 15, 2026
Due Date
Feb 12, 2026
Release: Jan 15, 2026
Covington Water District
Close: Feb 12, 2026
Installation of 380 LF of horizontal direction bored 14" HDPE pipe, connection to existing mains in two locations, cut-in tee, valves and appurtenances, surface restoration identified as grass, native shrubs, gravel, and AC Pavement.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Covington Water District
This Hazard Mitigation Plan for Covington Water District outlines a five-year strategy to enhance resilience against various hazards, including earthquakes, severe weather, flooding, and landslides. Key areas of focus include assessing existing systems and vulnerabilities, and implementing mitigation projects such as seismic retrofits for critical infrastructure (Tanks 3, 4, 1A/1B, Headquarters Building), water main replacements in high-risk areas (Little Soos Creek Crossing, Soos Creek Water Main), and improving fire protection and secondary water supply to different zones. The plan emphasizes continuous planning, engagement with regional partners, and prudent financial management to ensure reliable water service and community safety.
This Strategic Plan outlines the Covington Water District's direction for 2017-2019, emphasizing continuous improvement in managing long-term water supply, meeting development needs, and balancing capital reinvestment with operations and maintenance. The plan is guided by three key concepts: Community Investments, Infrastructure Investments, and Employee Investments, all aimed at strengthening service value and community connections.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Covington Water District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge