Special DistrictFL
Posted
Oct 27, 2026
Nov 10, 2026
Drinking Water Distribution System Replacement Project RFP
Project consists of Drinking water distribution system replacement project.
Description: Construct the Eastern Water Distribution System Reliability Project as shown in the drawings and specifications. The project will include the construction of multiple roads: Tibbs Bridge Rd, Headrick Circle, N. Woodland Dr, Keeter Rd, Riverside Dr, North Dr, Timberlake Dr, Sane Rd, Cavender Rd, Riverbend Rd, Bettis Rd, Gordon Dr, Shirley Dr, Matha Sue Dr, Leon Cr, Conasauga Way, Deal Dr, Greenson Bend, Jackson Kinnamon, Ridley Rd, Callie Jones, Barney Pierce, Thorton Rd, Adam Rd, Stafford Rd, Keswick Dr, Pannel Dr, Cochran Dr, Hwy 225, Hwy 52 Alt, Crestview Dr, Vann Cr, & Mary Sue. Rehab will consist of replacing existing pipe infrastructure, valves, fire hydrants, installing new services, connecting existing mains, driveway crossing (rock/concrete), etc.
SpecialDistrict · GA, US
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from Dalton Utilities.
Adjacent opportunities open for bidding right now.
Special DistrictFL
Posted
Oct 27, 2026
Nov 10, 2026
Project consists of Drinking water distribution system replacement project.
CityCA
Posted
Nov 3, 2026
Dec 2, 2026
Construction of approximately 1,680 linear feet of 12-inch PVC water transmission main, including removal and decommissioning of existing water facilities and associated valves, hydrant, tie-ins, and surface restoration.
Louisville-Jefferson County Metro Sewer District
Special DistrictKY
Posted
Oct 14, 2026
Nov 12, 2026
The project replaces existing feeder conductors with larger conductors. It installs a new NEMA 4x panelboard to provide separate power feeds to six gates and a mini-power center. It also installs a backup generator with a transfer switch.
Louisville-Jefferson County Metro Sewer District
Special DistrictKY
Posted
Oct 14, 2026
Nov 12, 2026
The project replaces existing feeder conductors with larger conductors. It installs a new NEMA 4x panelboard to provide separate power feeds to six gates and a mini-power center. It also installs a backup generator with a transfer switch.