See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
Water Main Replacement. Work includes 3,910.00 LF Directional Bore & Install 8" PE SDR 11 Water Main; 90.00 LF Directional Bore & Install 8" PE SDR 9 Water Main; 9.00 EA 2" Gate Valve & box; 14.00 EA 6" Gate Valve & box; 11.00 EaA 6” Fire Hydrant Assembly; 30.00 EA Single Short Service Connection; 20.00 EA Single Long Service Connection; 27.00 SY Asphalt Repair; 16.00 SY Remove & Replace Concrete; 1.00 LS Erosion Control.
Installation of approx., 4,000' of 8"-12" PVC water line with related fittings and appurtenances. Installation of a PRV vault. Installation of temporary asphalt patching.
The WORK includes the installation of approximately 3,560 linear feet of 12” DR-18 C900 waterline, 6,300 linear feet of 8” waterline, 600 linear feet of 6” DR-18 C900 waterline 53 water service extensions, connecting 16 water service to new main line, installing 56 new water services, installing 33 new fire hydrants, and other utility and roadway improvements.
Installation and/or replacement of approximately 3,500 linear feet of ductile iron water pipeline ranging from 8 inches to 24 inches, including water services, valves, fire hydrants, etc. The work shall consist of furnishing and installing all pipe, fittings, and appurtenances; all traffic control; all utility location and verification; all pavement removal and disposal; all pavement repair; all earthwork; compacting; protecting in place or removing and replacing all existing utilities, trees, and public and private improvements; testing and disinfecting all pipelines; replacing destroyed survey monuments; disposing of excess soil and rock material and restoring all areas and improvements to pre-construction conditions
Key Contacts on this RFP
Decision makers connected to this RFP from Fort Pierce Housing Authority.
From the first pre-RFP signals to the published RFP and its files.
Capital improvement plan
613 days before RFP
The U.S. Department of Housing and Urban Development approved the Housing Authority of the City of Fort Pierce's five-year action plan for 2025-2029, which includes planned AMP 3 dwelling-unit site work with water lines/mains.
See 3 sourcesHide sources
SCATTERED SITES (FL041000003) $1,527,000.00 Dwelling Unit Renovations AMP 3(Dwelling Unit-Site Work (1480)-Pedestrian paving,Dwelling Unit-Site Work (1480)-Sewer Lines - Mains,Dwelling Unit-Site Work (1480)-Signage,Dwelling Unit- Site Work (1480)-Water Lines/Mains,Dwelling Unit - Conversion (1480),Dwelling Unit - Demolition (1480),Contract Administration…
Housing Authority of the City of Fort Pierce Capital Fund Program - Five-Year Action Plan 2025-2029
SCATTERED SITES (FL04 1000003) $1,527.000 00 ID0000088 Dwelling Unit Renovations AMP 3(Dwelling Unit-Site Work ( 1480)-Pedestnan paving.Dwelling Unit-Site Work ( l480)-Sewer Lines - Mains.Dwelling Unit-Site Work ( l480)-Signage.Dwelhng Unit- Site Work ( 1480)- Water Lincs/Mains.Dwellmg Unit - Conversion ( l480),Dwelling Unit - Demolition
The Housing Authority Of The City Of Fort Pierce, Florida PHA 5-Year Plan 2025-2029
SCATTERED SITES (FL041000003) $1,527,000.00 Dwelling Unit Renovations AMP 3(Dwelling Unit-Site Work (1480)-Pedestrian paving,Dwelling Unit-Site Work (1480)-Sewer Lines - Mains,Dwelling Unit-Site Work (1480)-Signage,Dwelling Unit- Site Work (1480)-Water Lines/Mains,Dwelling Unit - Conversion (1480),Dwelling Unit - Demolition (1480),Contract Administration…
The Housing Authority of the City of Fort Pierce, Florida Regular Board Meeting
The Housing Authority's FY 2025 work statement lists Park Terrace site work including water lines/mains, with an estimated amount of $164,165.00.
See sourceHide source
Work Statement for Year 2025 Development Number/Name Quantity Estimated CostGeneral Description of Major Work CategoriesIdentifier Flooring (non routine),Dwelling Unit-Interior (1480)-Interior Doors,Dwelling Unit-Interior (1480)- Interior Painting (non routine),Dwelling Unit-Interior (1480)-Kitchen Cabinets,Dwelling Unit-Interior (1480)-Kitchen Sinks and…
The Housing Authority of the City of Fort Pierce, Florida Regular Board Meeting
Capital improvement plan
245 days before RFP
The Housing Authority of the City of Fort Pierce's approved 2026-2030 Capital Fund Action Plan includes 2026 dwelling-unit renovation site work covering water lines/mains.
See 2 sourcesHide sources
Status: Approval Date: Approved By:Approved 02/24/2026 GENEUS, GILBERT A. Development Number and Name Work Statement for Work Statement for Work Statement for Work Statement for Work Statement for 2026 2027 2028 2029 2030Year 5Year 4Year 3Year 2Year 1 PARK TERRACE (FL041000001) $477,884.00 $1,220,000.00 $477,884.00 SCATTERED SITES (FL041000003)…
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.