JD Cope MV/LV Switchgear RFP
Posted
Aug 14, 2026
Sep 11, 2026
Dalton Utilities seeks proposals for the design, fabrication, and delivery of electrical equipment for the J.D. Cope Energy Facility, a new 55.6 MW reciprocating-engine generation facility in Whitfield County, Georgia. The scope includes one 13.8 kV arc-resistant medium-voltage switchgear lineup and one 480 V arc-resistant low-voltage switchgear lineup, plus engineering submittals, manufacturer field services, spare parts, special tools, and documentation. Responses are due September 11, 2026, and the owner will select the proposal offering the best overall value, with projected award on September 16, 2026 and planned delivery on November 26, 2027.
