Closing soon

East Strand Force Main Replacement

Description: Work includes construction a new 8" sewage force main on the site of the kingston wastewater treatment plant. The work will consist of installation of approx. , 780 LF of new 8" PVC pressure pipe and connection to the existing system includes 550 CY of trench and culvert excavation; 375 CY of select granular fill; 2 EA of test pit excavation; temporary catch basin inserts - oil, hydrocarbons, trash, sediment and debris removal; 170 CY of subbase course, type 2; 65 TON ton of 9.5 f2 top course HMA , 80 series compaction; 98 TON of 25 f9 binder course HMA , 80 series compaction; 1,560 LF of asphalt pavement joint adhesive; 1,600 LF of saw cutting pavement; 780 LF plastic sewer force main pipe, 8", feet; 336 POUND of force main fittings, ductile iron (bends). See outside link.

Buyer
City of Kingston

City · NY, US

Released
Aug 10, 2026
Closes
Sep 1, 2026(10 days left)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts