East Strand Force Main Replacement
Work includes construction a new 8" sewage force main on the site of the kingston wastewater treatment plant. The work will consist of installation of approx. , 780 LF of new 8" PVC pressure pipe and connection to the existing system includes 550 CY of trench and culvert excavation; 375 CY of select granular fill; 2 EA of test pit excavation; temporary catch basin inserts - oil, hydrocarbons, trash, sediment and debris removal; 170 CY of subbase course, type 2; 65 TON ton of 9.5 f2 top course HMA , 80 series compaction; 98 TON of 25 f9 binder course HMA , 80 series compaction; 1,560 LF of asphalt pavement joint adhesive; 1,600 LF of saw cutting pavement; 780 LF plastic sewer force main pipe, 8", feet; 336 POUND of force main fittings, ductile iron (bends). See outside link.