CityCA
-
Closes
Sep 3, 2026
Avenue 50 Bridge Over Coachella Valley Stormwater Channel Improvement Project (RFP)
Construction of a new five‐span bridge over the CVSC (Whitewater River); the removal and reconstruction of Concrete Slope Protection (CSP) to preserve channel stability and maintain required hydraulic performance; removal and reconstruction of the CV/Link multimodal pathway; installation of new waterlines; reconstruction of concrete curb, curb and gutter, and driveways; placement of hot mix asphalt pavement; and installation of all required traffic signs, pavement markings, and striping